Question
|
|
Date:
|
7/8/2021 5:17:56 PM
|
In the Addendum dated July 6, 2021, why was bid item 370 - 27230 Fertilizer Nitrogen deleted? The new plan sheet 02C1r includes 26 lbs of Nitrogen in the Roadside Development Summary and 26 lbs were included in the original Schedule of Items.
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
7/8/2021 5:12:17 PM
|
Per the Addendum dated July 6, 2021, plan sheets 02 and 02B would be added to ProjectWise. It appears that 02B(1)r1 and 02Cr1 were updated on 6/30/2021. Is there an r1 for plan sheet 02?
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
6/18/2021 1:32:57 PM
|
This projects bids in 5 days. We need the updated line items posted to provide a bid. If that doesn't happen, will the department be delaying this bid again?
|
Answer
|
Date:
|
7/2/2021 4:21:11 PM
|
See revised items provided.
|
|
|
Question
|
|
Date:
|
6/16/2021 11:09:12 AM
|
When will the revised bid items be posted?
|
Answer
|
Date:
|
7/2/2021 4:21:32 PM
|
See revised items provided
|
|
|
Question
|
|
Date:
|
5/18/2021 2:39:52 PM
|
When does the department plan on answering the questions? The contractor needs time to get quotes based on answers or revised bid sheets.
|
Answer
|
Date:
|
7/2/2021 4:23:23 PM
|
See revised items provided
|
|
|
Question
|
|
Date:
|
6/17/2021 8:43:48 AM
|
Will the department be delaying this project until the July 28, 2021 letting?
|
Answer
|
Date:
|
7/2/2021 4:23:51 PM
|
Yes
|
|
|
Question
|
|
Date:
|
6/14/2021 8:40:11 AM
|
When does the department plan on answering the questions? Our suppliers will need time to provide quotes.
|
Answer
|
Date:
|
7/2/2021 4:24:28 PM
|
See revised items provided
|
|
|
Question
|
|
Date:
|
5/17/2021 2:31:03 PM
|
Roadside development sheet states 1.1 acres of seeding will be required. The class B topsoil calls for .31 CY of topsoil. Is this correct?
|
Answer
1 previous answer(s)
|
Date:
|
7/2/2021 4:24:55 PM
|
See revised bid list provided.
|
|
|
Question
|
|
Date:
|
5/18/2021 1:45:08 PM
|
I second this question - 0.31 CY of top toil amounts to 33.48 SF at a 3" depth.
|
Answer
|
Date:
|
7/2/2021 4:25:08 PM
|
See revised bid list provided.
|
|
|
Question
|
|
Date:
|
5/13/2021 1:22:17 PM
|
Please clarify that this foundation will be used for the 2" post. The STP-1 2" usually requires a STP-1 Ty A, B, C, D, or E. Please clarify the foundation and post required for this project.
|
Answer
|
Date:
|
7/2/2021 4:25:42 PM
|
STP-1 D type D see bid list.
|
|
|
Question
|
|
Date:
|
7/27/2021 8:13:20 AM
|
The answer to the previous question wanted us to bid this as STP-1 Type D. There is a huge difference between the two. How do we bid this?
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
7/15/2021 11:11:01 AM
|
The bid list dated 7/7/21 still had the STP-2 Ty D listed. Will this be corrected?
|
Answer
1 previous answer(s)
|
Date:
|
7/16/2021 11:46:39 AM
|
Please bid the foundations as shown on the Bid List, STP-2 type D
|
|
|
Question
|
|
Date:
|
5/12/2021 4:01:11 PM
|
According to the specification 8 cond cable (furnish & install) is included in the modify items.
Is this different than the line item 0660 55080for 8 cond cable. Please clarify.
|
Answer
|
Date:
|
5/20/2021 9:09:37 AM
|
The 8/1 conductor cable should be paid for under item 0660 55080. Summary Note 1 on sheet 5(4) states that the Modify pay item pays to disconnect and remove the existing conductor cables and connect the new conductor cables.
|
|
|
Question
|
|
Date:
|
5/12/2021 3:56:35 PM
|
Note 10 on sheet 5(2) states that the existing coaxial cable is to be removed and not replaced. According to the plans there is new coaxial cable shown in the conduit runs. If coaxial cable is needed a line item will need to be added.
|
Answer
|
Date:
|
5/13/2021 1:54:05 PM
|
Pay Item 51508 (coaxial cable) on Sheet 5(4) is to be used for the video detection cameras for the traffic signal modifications on sheet 5(1) and sheet 5(3).
|
|
|
Question
|
|
Date:
|
5/12/2021 3:54:41 PM
|
Will the contractor need to remove any of the existing junction boxes? If so, will you be adding a line item?
|
Answer
|
Date:
|
5/20/2021 9:10:05 AM
|
Junction boxes in the proposed turn lane areas will be removed. The cost will be incidental to the lump sum grading.
|
|
|
Question
|
|
Date:
|
5/12/2021 2:22:37 PM
|
Will you be adding a line item for the sign panel per sf?
|
Answer
|
Date:
|
5/20/2021 9:10:33 AM
|
Yes a line item will be added for the sign panel.
|
|
|