    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Bid Item 370 27230 Fertilizer Nitrogen Type: Bid Sheet
Question Date: 7/8/2021 5:17:56 PM
In the Addendum dated July 6, 2021, why was bid item 370 - 27230 Fertilizer Nitrogen deleted? The new plan sheet 02C1r includes 26 lbs of Nitrogen in the Roadside Development Summary and 26 lbs were included in the original Schedule of Items.  
Answer   Date:
 
 
Subject: Plan Sheet Changes Type: Other
Question Date: 7/8/2021 5:12:17 PM
Per the Addendum dated July 6, 2021, plan sheets 02 and 02B would be added to ProjectWise. It appears that 02B(1)r1 and 02Cr1 were updated on 6/30/2021. Is there an r1 for plan sheet 02?  
Answer   Date:
 
 
Subject: Sign Panel and Updated Bid List Items Type: Bid Sheet
Question Date: 6/18/2021 1:32:57 PM
This projects bids in 5 days. We need the updated line items posted to provide a bid. If that doesn't happen, will the department be delaying this bid again?  
Answer   Date: 7/2/2021 4:21:11 PM
See revised items provided.  
 
Question Date: 6/16/2021 11:09:12 AM
When will the revised bid items be posted?  
Answer   Date: 7/2/2021 4:21:32 PM
See revised items provided  
 
Subject: Unanswered Questions Type: Other
Question Date: 5/18/2021 2:39:52 PM
When does the department plan on answering the questions? The contractor needs time to get quotes based on answers or revised bid sheets.  
Answer   Date: 7/2/2021 4:23:23 PM
See revised items provided  
 
Question Date: 6/17/2021 8:43:48 AM
Will the department be delaying this project until the July 28, 2021 letting?  
Answer   Date: 7/2/2021 4:23:51 PM
Yes  
 
Question Date: 6/14/2021 8:40:11 AM
When does the department plan on answering the questions? Our suppliers will need time to provide quotes.  
Answer   Date: 7/2/2021 4:24:28 PM
See revised items provided  
 
Subject: Item #27023 Topsoil Class B Type: Bid Sheet
Question Date: 5/17/2021 2:31:03 PM
Roadside development sheet states 1.1 acres of seeding will be required. The class B topsoil calls for .31 CY of topsoil. Is this correct?  
Answer   1 previous answer(s) Date: 7/2/2021 4:24:55 PM
See revised bid list provided.  
 
Question Date: 5/18/2021 1:45:08 PM
I second this question - 0.31 CY of top toil amounts to 33.48 SF at a 3" depth.  
Answer   Date: 7/2/2021 4:25:08 PM
See revised bid list provided.  
 
Subject: 0470 Conc. Found. STP-2 Ty D Type: Bid Sheet
Question Date: 5/13/2021 1:22:17 PM
Please clarify that this foundation will be used for the 2" post. The STP-1 2" usually requires a STP-1 Ty A, B, C, D, or E. Please clarify the foundation and post required for this project.  
Answer   Date: 7/2/2021 4:25:42 PM
STP-1 D type D see bid list.  
 
Question Date: 7/27/2021 8:13:20 AM
The answer to the previous question wanted us to bid this as STP-1 Type D. There is a huge difference between the two. How do we bid this?  
Answer   Date:
 
 
Question Date: 7/15/2021 11:11:01 AM
The bid list dated 7/7/21 still had the STP-2 Ty D listed. Will this be corrected?  
Answer   1 previous answer(s) Date: 7/16/2021 11:46:39 AM
Please bid the foundations as shown on the Bid List, STP-2 type D  
 
Subject: 8 Conductor Cable Type: Specifications
Question Date: 5/12/2021 4:01:11 PM
According to the specification 8 cond cable (furnish & install) is included in the modify items. Is this different than the line item 0660 55080for 8 cond cable. Please clarify.  
Answer   Date: 5/20/2021 9:09:37 AM
The 8/1 conductor cable should be paid for under item 0660 55080. Summary Note 1 on sheet 5(4) states that the Modify pay item pays to disconnect and remove the existing conductor cables and connect the new conductor cables.  
 
Subject: Coaxial Cable Type: Plan
Question Date: 5/12/2021 3:56:35 PM
Note 10 on sheet 5(2) states that the existing coaxial cable is to be removed and not replaced. According to the plans there is new coaxial cable shown in the conduit runs. If coaxial cable is needed a line item will need to be added.  
Answer   Date: 5/13/2021 1:54:05 PM
Pay Item 51508 (coaxial cable) on Sheet 5(4) is to be used for the video detection cameras for the traffic signal modifications on sheet 5(1) and sheet 5(3).  
 
Subject: Existing Junction Boxes Type: Plan
Question Date: 5/12/2021 3:54:41 PM
Will the contractor need to remove any of the existing junction boxes? If so, will you be adding a line item?  
Answer   Date: 5/20/2021 9:10:05 AM
Junction boxes in the proposed turn lane areas will be removed. The cost will be incidental to the lump sum grading.  
 
Subject: Sign Panel Type: Bid Sheet
Question Date: 5/12/2021 2:22:37 PM
Will you be adding a line item for the sign panel per sf?  
Answer   Date: 5/20/2021 9:10:33 AM
Yes a line item will be added for the sign panel.  
 

Displaying questions 1 - 10 (of 19)