Question List
Subject: Warranty Type: Specifications
Question Date: 9/14/2020 10:37:37 AM
What is the warranty period for this project? Nothing is stipulated in the contract specifications for a project warranty length.  
Answer   Date: 9/16/2020 12:15:14 PM
No explicit warranty is required for the scope of the project. The project is the responsibility of the contractor until a closing C-5 is issued. At that time it becomes the responsibility of the Department.  
 
Subject: Bonds Type: Specifications
Question Date: 9/10/2020 10:30:47 AM
spec says bonds should conform to section 102.7? where do I locate that section? are performance/payment and bid bonds needed?  
Answer   Date: 9/15/2020 9:56:57 AM
Please see the Road and Bridge Specifications, Section 102.7. Yes, bid, performance and payment bonds are required.  
 
Subject: 84" Pipe Shape Type: Plan
Question Date: 9/1/2020 9:24:14 AM
Can you please confirm if the three different segments of 84" pipe are round?  
Answer   Date: 9/4/2020 8:31:46 AM
The segments in question are round.  
 
Question Date: 9/9/2020 8:08:04 AM
As a followup after a site visit of three of the culverts within the scope of work, it was noted that the pipes have ovality. The pipes were not 84" perfectly round/circular pipes as the previous response had implied, so we are following up for additional clarification. Much of the culvert was inaccessible at the time of the visit due to active flow and needed clearing/grubbing so we were unable to determine maximum ovalities for each culvert visited. As the ovality should be taken into consideration when determining engineered thickness designs, does the DOT have ovality information available as an engineering input for the design of this liner for consideration at the time of bid?  
Answer   Date: 9/9/2020 1:07:41 PM
The Department does not have ovality information.  
 
Subject: Plan holder's List Type: Other
Question Date: 8/27/2020 11:07:18 AM
Can you please provide an updated planholer's list for the rebid?  
Answer   Date: 8/31/2020 11:05:13 AM
The current plan holder's list is located in ProjectWise.  
 
Subject: C95-20-1 Type: Bid Sheet
Question Date: 8/21/2020 8:18:25 AM
C95-20-1 status is closed but no other information is available on EVA. Were any bids submitted for IFB C95-20-1? If so can a bid tab be made available?  
Answer   Date: 8/21/2020 8:31:35 AM
No bids were submitted.  
 