Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
C95
114867
9999-964-857, D601-D603
9/18/2020
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Warranty
Type:
Specifications
Question
Date:
9/14/2020 10:37:37 AM
What is the warranty period for this project? Nothing is stipulated in the contract specifications for a project warranty length.
Answer
Date:
9/16/2020 12:15:14 PM
No explicit warranty is required for the scope of the project. The project is the responsibility of the contractor until a closing C-5 is issued. At that time it becomes the responsibility of the Department.
Subject:
Bonds
Type:
Specifications
Question
Date:
9/10/2020 10:30:47 AM
spec says bonds should conform to section 102.7? where do I locate that section? are performance/payment and bid bonds needed?
Answer
Date:
9/15/2020 9:56:57 AM
Please see the Road and Bridge Specifications, Section 102.7. Yes, bid, performance and payment bonds are required.
Subject:
84" Pipe Shape
Type:
Plan
Question
Date:
9/1/2020 9:24:14 AM
Can you please confirm if the three different segments of 84" pipe are round?
Answer
Date:
9/4/2020 8:31:46 AM
The segments in question are round.
Question
Date:
9/9/2020 8:08:04 AM
As a followup after a site visit of three of the culverts within the scope of work, it was noted that the pipes have ovality. The pipes were not 84" perfectly round/circular pipes as the previous response had implied, so we are following up for additional clarification. Much of the culvert was inaccessible at the time of the visit due to active flow and needed clearing/grubbing so we were unable to determine maximum ovalities for each culvert visited. As the ovality should be taken into consideration when determining engineered thickness designs, does the DOT have ovality information available as an engineering input for the design of this liner for consideration at the time of bid?
Answer
Date:
9/9/2020 1:07:41 PM
The Department does not have ovality information.
Subject:
Plan holder's List
Type:
Other
Question
Date:
8/27/2020 11:07:18 AM
Can you please provide an updated planholer's list for the rebid?
Answer
Date:
8/31/2020 11:05:13 AM
The current plan holder's list is located in ProjectWise.
Subject:
C95-20-1
Type:
Bid Sheet
Question
Date:
8/21/2020 8:18:25 AM
C95-20-1 status is closed but no other information is available on EVA. Were any bids submitted for IFB C95-20-1? If so can a bid tab be made available?
Answer
Date:
8/21/2020 8:31:35 AM
No bids were submitted.
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
5/6/2024 6:07:44 AM
2008