    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Unanswered Questions Type: Other
Question Date: 7/17/2020 4:14:43 PM
Does the State intend to answer the remaining questions?  
Answer   Date: 7/17/2020 5:09:16 PM
Please see posted responses.  
 
Subject: GR-7 Type: Bid Sheet
Question Date: 6/19/2020 4:49:36 PM
Please explain difference between line item 270 "GR-7 Panel" and line item 280 "GR-7 W-Beam"?  
Answer   Date: 7/17/2020 5:09:56 PM
Panel See GR-7 R&B Standard Note 2. Gr-7 W-beam is standard rail length per Gr-7 specification.  
 
Subject: Modified item Type: Bid Sheet
Question Date: 6/19/2020 4:48:13 PM
Please clarify what is modified about line item 250 - "guardrail GR-2 radial modified, 8 ft post"?  
Answer   Date: 7/17/2020 5:06:42 PM
Length of post is modification.  
 
Subject: Block-out Type: Bid Sheet
Question Date: 6/19/2020 4:45:29 PM
The bid items depict 12" and 8" blocks. Does line item 480 - "offset block (wood or recycled) for 6" blocks?  
Answer   Date: 7/17/2020 5:07:40 PM
Contractor may use either, note if more than one block is needed same type shall be used.  
 
Subject: Response Type: Proposal
Question Date: 6/19/2020 2:03:50 PM
Without the State clarifying the posted questions regarding in-accurate units of measure for bid items, non-standard item descriptions and an unknown method of paying for repair items, the state is forcing odd bid pricing open to contractor interpretation.  
Answer   Date: 7/17/2020 5:04:39 PM
Please see updated quantities and added special provision in the addendum posted.  
 
Subject: Removal of MGS-2 Type: Bid Sheet
Question Date: 6/12/2020 7:59:45 PM
Will the state add an item to cover the cost of removing MGS-2 terminal?  
Answer   Date: 6/22/2020 3:22:41 PM
Pay Item 24502-REMOVAL EXIST-GUARDRAIL TERMINAL GR-9 should be used to remove MGS-2 terminals.  
 
Subject: Atten Pad Type: Bid Sheet
Question Date: 6/12/2020 7:57:22 PM
for line item 0560 Impact Attenuator, should the contractor include cost for placement of concrete pad or will the state provide a work order item to cover cost of concrete pad placement?  
Answer   Date: 6/22/2020 3:23:28 PM
Special Provision CN505-000100-00 IMPACT ATTENUATOR covers repairs and pad replacement. The pad replacement should be included in the pay item for an Impact Attenuator.  
 
Subject: Site Prep Type: Bid Sheet
Question Date: 6/12/2020 7:55:45 PM
Please explain the difference between line item 0190 Terminal Site Prep and items 0420, 0430, 0440 site prep 4' mod, 6' mod, minor?  
Answer   Date: 6/22/2020 3:24:05 PM
A Special Provision for GUARDRAIL TERMINAL SITE PREPARATION will be added to the contract.  
 
Subject: Term Beam Type: Bid Sheet
Question Date: 6/12/2020 7:51:32 PM
line item 0290 Guardrail GR-9 W-Beam Left was provided, will an item be added for Guardrail GR-9 W-Beam Right?  
Answer   Date: 6/22/2020 3:24:32 PM
The contract word “Left” will be removed from the contract. Left and Right are the same beam.  
 
Subject: Post Leave Out Type: Bid Sheet
Question Date: 6/12/2020 7:49:24 PM
item for Post Leave out is shown to be paid for by linear foot. Please explain what would be measured in linear feet to facilitate payment?  
Answer   Date: 6/22/2020 3:24:57 PM
The Contract will be corrected. The will be paid for by each unit.  
 

Displaying questions 1 - 10 (of 12)