Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
D01
116644
9999-966-365,N501
7/17/2020
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Unanswered Questions
Type:
Other
Question
Date:
7/17/2020 4:14:43 PM
Does the State intend to answer the remaining questions?
Answer
Date:
7/17/2020 5:09:16 PM
Please see posted responses.
Subject:
GR-7
Type:
Bid Sheet
Question
Date:
6/19/2020 4:49:36 PM
Please explain difference between line item 270 "GR-7 Panel" and line item 280 "GR-7 W-Beam"?
Answer
Date:
7/17/2020 5:09:56 PM
Panel See GR-7 R&B Standard Note 2. Gr-7 W-beam is standard rail length per Gr-7 specification.
Subject:
Modified item
Type:
Bid Sheet
Question
Date:
6/19/2020 4:48:13 PM
Please clarify what is modified about line item 250 - "guardrail GR-2 radial modified, 8 ft post"?
Answer
Date:
7/17/2020 5:06:42 PM
Length of post is modification.
Subject:
Block-out
Type:
Bid Sheet
Question
Date:
6/19/2020 4:45:29 PM
The bid items depict 12" and 8" blocks. Does line item 480 - "offset block (wood or recycled) for 6" blocks?
Answer
Date:
7/17/2020 5:07:40 PM
Contractor may use either, note if more than one block is needed same type shall be used.
Subject:
Response
Type:
Proposal
Question
Date:
6/19/2020 2:03:50 PM
Without the State clarifying the posted questions regarding in-accurate units of measure for bid items, non-standard item descriptions and an unknown method of paying for repair items, the state is forcing odd bid pricing open to contractor interpretation.
Answer
Date:
7/17/2020 5:04:39 PM
Please see updated quantities and added special provision in the addendum posted.
Subject:
Removal of MGS-2
Type:
Bid Sheet
Question
Date:
6/12/2020 7:59:45 PM
Will the state add an item to cover the cost of removing MGS-2 terminal?
Answer
Date:
6/22/2020 3:22:41 PM
Pay Item 24502-REMOVAL EXIST-GUARDRAIL TERMINAL GR-9 should be used to remove MGS-2 terminals.
Subject:
Atten Pad
Type:
Bid Sheet
Question
Date:
6/12/2020 7:57:22 PM
for line item 0560 Impact Attenuator, should the contractor include cost for placement of concrete pad or will the state provide a work order item to cover cost of concrete pad placement?
Answer
Date:
6/22/2020 3:23:28 PM
Special Provision CN505-000100-00 IMPACT ATTENUATOR covers repairs and pad replacement. The pad replacement should be included in the pay item for an Impact Attenuator.
Subject:
Site Prep
Type:
Bid Sheet
Question
Date:
6/12/2020 7:55:45 PM
Please explain the difference between line item 0190 Terminal Site Prep and items 0420, 0430, 0440 site prep 4' mod, 6' mod, minor?
Answer
Date:
6/22/2020 3:24:05 PM
A Special Provision for GUARDRAIL TERMINAL SITE PREPARATION will be added to the contract.
Subject:
Term Beam
Type:
Bid Sheet
Question
Date:
6/12/2020 7:51:32 PM
line item 0290 Guardrail GR-9 W-Beam Left was provided, will an item be added for Guardrail GR-9 W-Beam Right?
Answer
Date:
6/22/2020 3:24:32 PM
The contract word “Left” will be removed from the contract. Left and Right are the same beam.
Subject:
Post Leave Out
Type:
Bid Sheet
Question
Date:
6/12/2020 7:49:24 PM
item for Post Leave out is shown to be paid for by linear foot. Please explain what would be measured in linear feet to facilitate payment?
Answer
Date:
6/22/2020 3:24:57 PM
The Contract will be corrected. The will be paid for by each unit.
Displaying questions 1 - 10 (of 12)
Page:
1
2
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/29/2024 4:20:35 PM
2008