Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
C91 115176 9999-961-410,B612 6/19/2020
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Clean and Reseal Joint Type: Proposal
Question Date: 6/2/2020 8:12:50 AM
What material will be used for the reseal of the joints? Page 152 mentions a new Preformed Elastomeric Joint Sealer under Item 0280 - Expansion Joint Reconstruction (VES) but does not spec out a type or size.  
Answer   Date:
 
 
Subject: TS Temporary Traffic Control Signal Type: Proposal
Question Date: 5/20/2020 4:02:09 PM
In the spec part of the proposal for this item it says locations are found on pages 13-20. The pages specified are the wage decision. Without the locations and drawings how is the contractor supposed to know what the temporary will entail to price this item.  
Answer   Date: 5/21/2020 9:05:27 AM
The no-plan assembly included language stating that “Locations for the initial replacement or repair of bridge components are noted on sheets 13-20”. This statement can be found on page 131 of the contract assembly. This statement refers to sheets 13-20 of the no-plan assembly, not the total compiled contract. The structure locations, which are actually the task orders for the first 4 bridges, begin on page 141 of the contract and give the latitude and longitude of each structure. As built drawings for these structures will be loaded to project wise.  
 

Displaying questions 1 - 2 (of 2)
Page: 1 First Previous Next Last