Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
B62 110951 0734-038-780, B652 10/18/2019
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Plan Sheet 10A Type: Plan
Question Date: 9/11/2019 8:55:18 AM
Plan Sheet Status is "Checked In" as opposed to "Final". The PDF cannot be opened.  
Answer   Date: 9/13/2019 11:32:13 AM
Plan sheet is now marked as Final.  
 
Question Date: 9/30/2019 4:00:42 PM
Pay item 68490; Disposal of Material Str. No. 6084 Ty B. We would like to have existing bridge information. I believe Ty B refer to Lead contain material and dispose as accordingly. Please provide more information.  
Answer   Date: 10/2/2019 10:00:27 AM
Structure is classified as a Type B structure which may have existing coatings contain hazardous materials. Pay Item 68490 is intended for disposal of any hazardous materials. See section 411 of Specifications for descriptions. Existing bridge plans do not exist.  
 
Question Date: 9/30/2019 3:58:44 PM
Can we substitute Dewatering Basin EC-8 for Dewatering Bag?  
Answer   Date: 10/2/2019 10:02:25 AM
No  
 
Question Date: 9/30/2019 2:47:10 PM
There is a pay item for Temporary Bridge and shown in the contract proposal page 147&149 but not much in detail. What is VDOT expectation/intent to have temporary work bridge. Demolition middle pier? Also demolition of middle pier how deep we need to remove the existing pier? Please provide specific information.Not much information about bridge abutments reconstruction. Please provide all details information.  
Answer   Date: 10/2/2019 10:22:38 AM
Intent for temporary work bridge is for removing existing pier. Pier shall be removed a minimum of 1' below steam bed. Its at the contractors discretion of how temporary bridge will be constructed. Abutment footings and wingwalls shall be designed by contractor specific to the precast structure that will be used. Foundation elevations and geology findings are provided in plans for design purposes. VDOT isn't allowed to call out specific manufacturer of precast structure so footings and wingwalls will need to be designed per manufacturers dimensions and design calculations of structure.  
 

Displaying questions 1 - 1 (of 1)