Question
|
|
Date:
|
10/10/2019 7:56:59 AM
|
On Sheet CTS-11, what is happening to the existing pedestal pole with pedestrian signal head and pushbutton in the NW corner of the intersection? Is that to remain or be removed?
|
Answer
|
Date:
|
10/11/2019 11:35:01 AM
|
CTS-11 will be revised via addendum.
|
|
|
Question
|
|
Date:
|
9/19/2019 6:33:16 PM
|
CTS 11 shows installing a new 6' PF-2 pole. However, there is no quantity in the Bid Schedule for a 6' PF-2 pole. There are 2 EA. Relocate Pedestal Pole. But the plans only show 1 EA. (See CTS 8). Please review and provide clarification.
|
Answer
|
Date:
|
9/24/2019 10:34:42 AM
|
Quantities will be revised via Addendum.
|
|
|
Question
|
|
Date:
|
9/19/2019 5:39:34 PM
|
General Note 4 on Page 126 states a PCMS is required for all lane closures. However, the measurement and payment for the Lump Sum MOT does not include PCMS. Are PCMS's required for all lane closures? If so, please add a pay item for PCMS.
|
Answer
|
Date:
|
9/24/2019 10:32:56 AM
|
Payment for PCMS is covered on page 80.
|
|
|
Question
|
|
Date:
|
10/7/2019 12:00:39 PM
|
Are PCMS's required for all lane closures?
|
Answer
|
Date:
|
10/11/2019 11:34:28 AM
|
PCMS's are not required. The General Note referencing PCMS's will be removed via addendum.
|
|
|
Question
|
|
Date:
|
9/19/2019 5:37:58 PM
|
The RRFB Special Provision on Pages 196 to 199 discusses solar panels, PF-2 poles, wireless radios, etc. However, the plans call for the RRFBs to be hardwired and attached to the mast arms. Request that the measurement and payment item for the RRFB be revised to fit with the specific project requirements.
|
Answer
|
Date:
|
9/24/2019 10:31:48 AM
|
Only the items needed to hardwire and attach the RRFB to the mast arms will be necessary.
|
|
|
Question
|
|
Date:
|
9/19/2019 5:37:55 PM
|
The RRFB Special Provision on Pages 196 to 199 discusses solar panels, PF-2 poles, wireless radios, etc. However, the plans call for the RRFBs to be hardwired and attached to the mast arms. Request that the measurement and payment item for the RRFB be revised to fit with the specific project requirements.
|
Answer
|
Date:
|
9/24/2019 10:32:13 AM
|
Only the items needed to hardwire and attach the RRFB to the mast arms will be necessary.
|
|
|
Question
|
|
Date:
|
9/19/2019 3:11:10 PM
|
Page 181 and 182 show a luminaire and luminaire arm attached to the signal pole. However there are no pay items and no details on the plans for the luminaire and luminaire arms. Are the luminaires and luminaire arms required for this project?
|
Answer
|
Date:
|
9/24/2019 10:29:51 AM
|
Luminaires and luminaire arms will not be required.
|
|
|
Question
|
|
Date:
|
9/19/2019 3:08:48 PM
|
Missing pay item for Hanger Assembly SM-3 for the new signal head to be installed on page 141.
|
Answer
|
Date:
|
9/24/2019 10:30:23 AM
|
The Hanger Assembly SM-3 will be added to the proposal.
|
|
|
Question
|
|
Date:
|
9/19/2019 3:03:15 PM
|
Page 124 states Audible Pedestrian Actuation shall be provided. However, the special provisions for the RRFB state a standard pushbutton is required. Please clarify the type of pushbutton required.
|
Answer
1 previous answer(s)
|
Date:
|
9/24/2019 1:57:16 PM
|
For this project, accessible (audible) pedestrian push-buttons are required. Pursuant to a September 2018 revision to VDOT’s Road & Bridge Standards, Accessible Pedestrian Signal Units are now part of Standard PA-4.
|
|
|
Question
|
|
Date:
|
9/10/2019 8:49:20 AM
|
According to our supplier the way the drawings show the RRFB are not in compliant. Please clarify.
An RRFB unit shall not be installed independent of the crossing warning signs for the approach that the RRFB faces. If the RRFB unit is supplementing a post-mounted sign, the RRFB unit shall be installed on the same support as the associated W11-2, S1-1, or W11-15 crossing warning sign and plaque. If the RRFB unit is supplementing an overhead-mounted sign, the RRFB unit shall be mounted directly below the bottom of the sign.
|
Answer
|
Date:
|
9/13/2019 11:44:48 AM
|
The position of the RRFB will be adjusted to show the RRFB situated directly below the overhead signs.
|
|
|
Question
|
|
Date:
|
9/9/2019 11:06:26 AM
|
Will the department be adding a line item for the hanger assembly smd-2 for the overhead signs?
|
Answer
|
Date:
|
9/13/2019 11:44:17 AM
|
A line item for SMD-2 hanger assemblies will be added.
|
|
|
Question
|
|
Date:
|
9/9/2019 9:53:21 AM
|
For the VA Capital Trail @ S Laburnum Ave intersection conduit run is calling for 1" pvc conduit. Will the department be adding this to the line items?
|
Answer
|
Date:
|
9/13/2019 11:43:58 AM
|
A line item for 1” PVC Conduit will be added.
|
|
|