Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
B38 110112 0632-050-597, M501, B617 8/16/2019
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Borrow Material Type: Plan
Question Date: 7/30/2019 9:43:40 AM
General Note G-6 from Plan Sheet 2 indicates Borrow Material with a minimum CBR Value of 5 should be used for this project. Should a bid item for CBR 5 Borrow Material be added?  
Answer   Date: 8/20/2019 8:23:02 AM
General Note G-6 was removed by addendum. No Item will be added.  
 
Subject: Clearing Bid Item Type: Bid Sheet
Question Date: 7/25/2019 1:40:04 PM
Will a bid item for any required clearing be added to the Schedule of Items?  
Answer   Date: 8/1/2019 3:37:21 PM
Per the 2016 Road and Bridge Specification Manual, Section 306.06(f) (page 367) for minimum plan projects, clearing is included in grading pay item.  
 
Subject: As-Built Drawings Type: Plan
Question Date: 7/25/2019 1:38:53 PM
Can the Department provide as-built drawings for the existing structure?  
Answer   Date: 8/1/2019 3:37:48 PM
No existing plans for this structure are available.  
 

Displaying questions 1 - 3 (of 3)
Page: 1 First Previous Next Last