Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
B05
114689
DP3A-963-F19,N501
5/17/2019
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
#26 and #57 Stone
Type:
Proposal
Question
Date:
5/17/2019 9:57:46 AM
What is the intended use for this line item? Is #26 and #57 stone incidental to the installation of contract endwalls or will it be paid for separately?
Answer
Date:
5/17/2019 2:48:12 PM
Item 00505: BEDDING MATL. AGGR. NO. 25 OR 26 and item 00507 BEDDING MATL. AGGR. NO. 57 will be measured and paid for separately only when conditions are encountered that are outside of the normal limits for bedding material required per the standard.
Subject:
Mobilization Site
Type:
Proposal
Question
Date:
4/25/2019 11:23:39 AM
The Special Provision for Site Mobilization indicates that one mobilization will be paid per Task Order issued. The Special Provision also references the potential for multiple sites within a given Task Order. Because there are multiple costs that need to be included in this Site Mobilization item (access, clearing, equipment movement, dewatering, etc), can a maximum number of sites per Task Order by stipulated?
Answer
Date:
5/3/2019 2:15:23 PM
Only one mobilization will be paid per task order unless there are multiple locations included in one task order and it is necessary for the Contractor’s equipment to be loaded and hauled to the additional locations as determined by the Engineer. Other costs (access, clearing, dewatering, etc.) shall be included in the price bid per linear foot of corresponding pipe. This will be clarified in the forthcoming addendum.
Question
Date:
5/17/2019 10:25:54 AM
If the Department requires the Contractor to include the cost of unknown limits for clearing, access, dewatering, etc within the individual line items for pipe replacement/rehabilitation, we will necessarily include costs that may not be required for each pipe installation. By doing so our unit price for pipe replacement/rehabilitation will be unnecessarily over-estimated. THIS WILL RESULT IN A BID PROPOSAL THAT WILL EXCEED THE STATED EVALUATIVE ESTIMATE. If the Department does not provide a more specific pay item to separate these costs it will not allow for award of the contract and delay the procurement period and subsequently the necessary maintenance to be performed.
Answer
Date:
5/17/2019 3:07:21 PM
The Department understands the nature of an on-call contract and associated risks. Three sample locations have been included in the site document to give the contractor an understanding of sites encountered for estimating purposes.
Displaying questions 1 - 2 (of 2)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/25/2024 6:56:11 AM
2008