A82
111277
0046-012-777,B624
3/15/2019
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Aluminum Rail
Type:
Plan
Question
Date:
3/12/2019 10:07:56 AM
Regarding the anchor bolts as called out on sheet 11 of 13 - plans show using an aluminum bolt. In this application, wouldn't a stainless steel bolt be more appropriate? Also, is this rail mill finish?
Answer
Date:
3/13/2019 12:11:18 PM
Stainless steel bolts would be an acceptable alternate to the shown aluminum bolts. The rail should be mill finish.
Subject:
Parapet
Type:
Plan
Question
Date:
3/8/2019 9:07:19 AM
There is a discrepancy between measurements on Sheet 6 of 13 and 10 of 13. The measurement for the concrete projection from the curb for the parapet shows 1'-6" on sheet 6 and 1'-3" on sheet 10. Please clarify.
Answer
Date:
3/8/2019 2:43:14 PM
The correct dimension is 1'-6". Plans will be revised to show this correction.
Subject:
Quantities
Type:
Bid Sheet
Question
Date:
2/22/2019 2:26:05 PM
There are several discrepancies with the quantities and bid items shown in the Bid Proposal and the Plan set. They are as follows: The Bid Proposal has a quantity for Type B Class I PVMT Line markings that is not included in the quantity table on the plan set. The quantity table on the plans calls for a Cover Depth Survey but it is not included in the Bid Proposal quantities. The quantity table on the plans call for Type B Patching (HES) but it is not included in the Bid Proposal quantities. The quantity for Diamond Grinding in the Bid Proposal is shown as 212 SY and shown on the plans as 181 SY.
Answer
Date:
3/8/2019 2:47:10 PM
-The Bid Proposal quantity for Type B Class I PVMT Line markings is correct. This will be added to the plan set quantity table as a revision. -Cover Depth Survey will be added to the Bid Proposal quantities. -Type B Patching (HES) will be added to the Bid Proposal quantities. -The correct quantity for Diamond Grinding is 181 SY. The Bid Proposal will be revised.
Subject:
Light Weight Concrete
Type:
Specifications
Question
Date:
2/22/2019 9:38:00 AM
The plans call for lightweight concrete to be used on the bridge deck. What is the maximum allowable unit weight for the lightweight concrete on this project?
Answer
Date:
3/8/2019 2:46:05 PM
The specification contains a unit error which has been corrected in the revision.
Subject:
As-built Plans
Type:
Plan
Question
Date:
2/22/2019 6:58:42 AM
Can the as-built plans for the existing bridge be provided?
Answer
Date:
2/26/2019 2:57:27 PM
As-builts have been posted in ProjectWise.
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/29/2024 2:24:10 AM
2008