Subject: Cover for new jackets Type: Specifications
Question Date: 9/18/2018 11:40:40 AM
How much cover is required on between the existing pile and the new pile jackets? 2", 3", 4" ? Based on Sheet 134 of the special provision it appears as though we are putting back the same as what we take out,.  
Answer   Date:
 
 
Subject: Existing Pile Jackets Type: Other
Question Date: 9/18/2018 11:38:46 AM
What size / dimensions are the existing pile jackets?  
Answer   Date:
 
 
Subject: Bent 6 Type: Other
Question Date: 9/18/2018 11:22:55 AM
Sheet 3 of 3 indicates bent 6 is a type IV, with 5 piles. Sheet 2 of 3 indicates that there are 16 piles at bent 6. What is the correct number of piles?  
Answer   Date:
 
 
Question Date: 9/18/2018 12:00:25 PM
Please confirm the length of the pile jackets on bent 6. Bent 6 should have a jacket as per page 132 of the specifications, 6' long since it does not have a pile cap.  
Answer   Date:
 
 
Question Date: 9/18/2018 11:45:52 AM
Sheet 3 of 3 indicates that bent 8 is a type V. The detail for a type V shows 14 piles. The table on sheet 3 of 3 shows 16 piles at bent 8, and sheet 2 of 3 also shows 16 piles for bent 8. What is the correct number of piles?  
Answer   Date:
 
 
Question Date: 9/18/2018 11:44:47 AM
Sheet 3 of 3 indicates bent 7 is a type V, with 14 piles. Sheet 2 of 3 indicates that there are 16 piles at bent 7. What is the correct number of piles?  
Answer   Date:
 
 
Subject: Hurricane Florence Type: Other
Question Date: 9/10/2018 12:52:01 PM
Due to the impending Hurricane Florence, would it be possible to extend the bid date by two weeks?  