Subject: ATC Cabinet - Special Provision Type: Specifications
Question Date: 9/21/2018 11:28:06 AM
It has come to our attention that the Special Provision for the ATC Cabinet has been revised. We would request that the latest special provision be included in this project.  
Answer   Date:
 
 
Subject: Trian Count Type: Specifications
Question Date: 9/6/2018 10:46:10 AM
Please provide the number of trains that travel the track per day for insurance purposes.  
Answer   Date: 9/10/2018 9:48:52 AM
As noted on page 75 of the bid proposal, Section 107.19 - Railway - Highway Provision, Three (3) trains per day per track.  
 
Subject: Railroad Insurance Type: Proposal
Question Date: 8/31/2018 12:42:56 PM
Page 76 of the proposal lists the Railroad Protective Liability Insurance coverage limits as $5,000,000 each occurrence and $10,000,000 aggregate. Page 218 lists the coverage as $2,000,000 each occurrence and $6,000,000 aggregate if passenger trains don’t operate on the track; and $5,000,000 each occurrence and $10,000,000 aggregate if passenger trains do operate. Please confirm which limits apply.  
Answer   Date: 9/5/2018 4:29:55 PM
The $5,000,000 and $10,000,000 are applicable.  
 
Subject: As-Builts Type: Plan
Question Date: 8/28/2018 9:45:35 AM
Please post the existing bridge plans/as-builts.  
Answer   Date: 9/13/2018 1:41:42 PM
Plans are located on ProjectWise  
 
Subject: Combined pdf files - Part 1 and Part 2 Type: Plan
Question Date: 8/28/2018 9:14:05 AM
Due to digital signatures, we are unable to combine a majority of the plan sheets. Specifically sheets 0064-043-744C501_03 through 0064-043-744C501-11(4). Would the Dept please provide a combined pdf of this "Part 2" and a combined pdf of "Part 1" - sheets 1 through 2W(2)?  
Answer   Date: 9/18/2018 3:26:59 PM
The plans have been merged into one file and posted in ProjectWise.  
 
Subject: Pavement Markings Type: Bid Sheet
Question Date: 8/27/2018 10:22:38 AM
Items 1970 thru 1990 are bid as ty. D Should this be TYpe D II or Type D III.?  
Answer   Date: 9/13/2018 1:43:13 PM
Type D III. Clarification will be added to the Schedule of Items in the upcoming revision.  
 
Question Date: 8/27/2018 10:21:07 AM
Item 1960 Temp. Pvmt Symbol Mrkg Railroad Crossing Ty. A , 28 ea. Please review the quantity?  
Answer   Date: 9/13/2018 1:43:32 PM
Plan quantity is correct  
 
Question Date: 8/27/2018 10:19:02 AM
Item 1950 Temp. Pvmt Mrkg Ty. A 8", 282,082 Lf This quantity looks very large for 8" line . Please review ?  
Answer   Date: 9/13/2018 1:43:51 PM
Plan quantity is correct  
 
Question Date: 8/27/2018 10:16:44 AM
Items 1930 thru 1940 What materials should these be applied with ?  
Answer   Date: 9/13/2018 1:44:17 PM
These items shall follow VDOT standards for installation. These items are Type B Class I.  
 
Question Date: 8/27/2018 10:15:19 AM
Item 1920 Snowplow. Raised Pave. Marker Asph. Conc. 4420 each. The pavement marking plans show these spaced every 40 feet on skip lines only. Is this Correct ?  
Answer   Date: 9/13/2018 1:44:58 PM
The spacing of the raised pavement markers shall be per VDOT standards per PM-8.  
 
Question Date: 8/27/2018 10:11:32 AM
Item 1900 Pavement Marking Ty. B Cl ass VI Pvmt Line Mrkg 2' - 4' skip.Does the quantity include the space area as weel as the skip ? Is the skip 2' long or 4" long? What width is this skip? Should it be included in other items ?  
Answer   Date: 9/13/2018 1:45:52 PM
No, the quantity does not include the 4-ft spacing of the skip. Marking is 2’ long, 4’ skip, 6” width.  
 
Question Date: 8/27/2018 10:07:15 AM
Item 1890 Pavement Marking Ty. B Class VI Pvmt Line Mrkg 10' - 30' Skip.Does this quantity include the space area as well as the skip ? Is the skip 10' long or 30' long ? Should this item be included with Item 1860 ?  
Answer   Date: 9/13/2018 1:46:13 PM
No, the quantity does not include the 30-ft spacing. Item should not be included with Item 1860. Item is 10’ long, 30’ skip.  
 
Question Date: 8/27/2018 9:51:07 AM
Item 1880 Pavement Marking Type B Class VI 3' long, 9' skip 6" contrast Bridge Marking White. Does the quantity include the space area as weel as the skip? Is the skip 3' or 9' ?  
Answer   Date: 9/13/2018 1:47:16 PM
No, the quantity does not include the 9-ft spacing. The skip is 9’ as listed.  
 
Question Date: 8/27/2018 9:40:10 AM
Itam 1870 Pavement Marking Perm. ( Typ B Cl. VI 3' Long9" Skip. Again does the quantity include the space area as well as the skip? Is the skip 3' or 9' ? Should this quantity be included in item 1820?  
Answer   Date: 9/13/2018 1:49:03 PM
No, it does not include the space between the skips. No, the quantity is not included as part of item 1820. As listed item is 3’ long, has a 9’ skip and is 6” wide.  
 
Question Date: 8/27/2018 9:35:29 AM
Item 1860 Pavement Marking Constr. Pave. Mark. Ty. B Cl. VI 6". What is This ?Should this be Constr. Pavement Marking Type D III 6" Is 880 lf enough?  
Answer   Date: 9/13/2018 1:49:54 PM
It’s Contrast Pavement marking. This material is typically applied to bridge surfaces.  
 
Question Date: 8/27/2018 9:31:57 AM
Item 1850 Pavement Marking 6" Contrast 30' - 10' skip, 165 LF. Does the quantity include the space area as well as the skip? Is the skip normal VDOT standard 10' long or 30' long? Should this quantity be included in item 1820 ?  
Answer   Date: 9/13/2018 1:53:50 PM
No. The quantity only include the skip which is normal/standard VDOT skip. It isn't to be included in item 1820.  
 
Question Date: 8/27/2018 9:27:02 AM
Items 1790 thru 1810 are bid as Type A Pavement Line Markings4",6",24". These markings are shown on the MOT plans as temporary pavement markings. Should these items be Temporary Pavement Markings Type A 4", 6", 24"?  
Answer   Date: 9/13/2018 1:55:48 PM
Yes, these are temporary pavement markings. Clarification to the Schedule of Items will be done in the upcoming revision for these items.  
 
Subject: Proposal Type: Proposal
Question Date: 8/20/2018 9:55:41 AM
Can you please add the proposal to Project Wise? The folder is there but it appears to be empty.  
Answer   Date: 8/20/2018 12:00:40 PM
File is now visible.  
 