Subject: Paving Typical Section Type: Proposal
Question Date: 6/5/2018 10:55:15 AM
Page 94, paragraph 2 of the proposal lists 2 different depths of materials for paving, are there 2 separate typical sections for areas of trenching and paving? if so, are there any estimated quantities for each?  
Answer   Date: 6/7/2018 3:28:01 PM
No, there are not separate typical sections for trenching and paving, pavement recommendations are the same for trenching and paving. Page 94 has been revised to correct the depths and will be available in the forthcoming Addendum.  
 
Subject: Demolition of Pavement (Combination) Type: Proposal
Question Date: 6/5/2018 10:42:29 AM
Will Item 24410 DEMOLITION OF PAVEMENT (COMBINATION) be used to pay for all areas of trenching no matter what type of surface is on the existing shoulder?  
Answer   Date: 6/19/2018 3:46:18 PM
Yes, all existing surfaces types.  
 
Subject: Aggregate Base Material Type: Proposal
Question Date: 6/5/2018 10:15:39 AM
Will any of Item 10128 AGGR. BASE MATL. NO. 21B be used as shoulder stone along the outside edge of the shoulder or is it intended to be base stone under asphalt only?  
Answer   Date: 6/6/2018 4:02:57 PM
Aggr. Base Matl. No. 21b is intended to be used as base stone under the asphalt only.  
 
Subject: Rumble Strip Type: Proposal
Question Date: 6/5/2018 10:04:08 AM
What is the width of the rumble strip to be cut into the shoulder?  
Answer   Date: 6/6/2018 4:01:38 PM
The rumble strips shall be constructed to RS-1 standard for continuous groove shoulder rumble strips as covered in the 2016 Road and Bridge Standards section 304.01. This sheet will be included in the proposal addendum and RS-1 type is noted on the pavement typical section which will also be in the addendum.  
 
Subject: Width of Trenching and Paving Type: Proposal
Question Date: 6/5/2018 9:42:46 AM
Where the existing paved shoulder is 10 feet wide, is the trenching and paving width limited to 4 feet? Does the 4 foot width include the portion of the travel lane to be removed for replacement of the edge line?  
Answer   Date: 6/6/2018 4:04:39 PM
Yes, in the existing 10 feet wide sections the trenching and paving width is limited to 4' shoulder width and 1' additional was calculated to remove the existing edge line pavement marking. Contractors should not be tying the shoulder into the pavement any further into the travel lane than 16 inches outside of the edge line pavement marking.  
 
Subject: Limits of Trenching and Paving Existing Shoulder Type: Proposal
Question Date: 5/31/2018 11:01:57 AM
Information from pages 96-106 of the proposal indicate that Full Depth paving for the WBL starts at the Galax City limits and continues approximately 5 miles to the middle of the project while Full Depth paving for the EBL starts at Route 274 and continues approximately 5 miles to the middle of the project. During a visit to the site, we noted that existing paved shoulder conditions for the EBL may suggest that the new paved area for the EBL should be located on the Galax end of the project in approximately the same location as the WBL improvements. In addition, it appears that most of the shoulder area in both lanes that are west of Route 94 may not require trenching and paving. Could you please verify that the areas described in the proposal are the correct locations for the shoulder improvements.  
Answer   Date: 6/6/2018 4:03:38 PM
The information on pages 96-106 has been revised and will be corrected in an Addendum to this proposal.  
 

Displaying questions 1 - 6 (of 6)