Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
N27
104936
(NFO)0081-098-778,B650-51,C501
9/21/2018
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Grading
Type:
Proposal
Question
Date:
9/24/2018 12:28:35 PM
In the Addendum dated September 12, 2018, Bid Items #00160 Grading (Stage 1-5) were added, but Regular Excavation and Borrow Excavation Bid Items remained. Where does the work for the Regular Excavation and Borrow Excavation bid items take place?
Answer
Date:
Subject:
Removal of Asphalt
Type:
Plan
Question
Date:
9/14/2018 8:42:47 PM
Is removal of Temporary asphalt on the temporary diversions is it included with the Demo of Pavement pay Item or should it be included in the Lump Sum Grading Stages Pay item ?
Answer
Date:
9/17/2018 10:42:54 AM
Demolition of Temporary Pavement is included in the bid item quantity for Demolition of Pavement.
Subject:
Lane Rental Charges
Type:
Plan
Question
Date:
9/13/2018 9:46:27 AM
Sheet 1G, note 5. A. states that no lane closures will be allowed between 6am and 9pm. The contractor shall be subject to hourly fines for lanes shut down during those times. What are the values of the lane rental / hourly fines?
Answer
Date:
9/14/2018 11:56:15 AM
This note has been deleted from the plans as there are no hourly fines for this project. The Contractor is not permitted to have a lane closure during the hours of 6AM to 9PM.
Subject:
Rock Excavation
Type:
Proposal
Question
Date:
8/14/2018 7:36:59 AM
Will Rock Excavation apply to the Jack & Bore Pipe items?
Answer
Date:
9/14/2018 3:38:02 PM
No, the contractor needs to proceed with the Jack and Bore pipe installation in accordance with Section 302.03(a)1 of the 2016 Road and Bridge Specifications which covers the ‘Jack and Bore Method’ and how to address obstructions encountered during the jack and bore operations.
Subject:
Rock Excavation
Type:
Other
Question
Date:
9/18/2018 6:07:05 PM
Does installation of Drainage structures mean the Drop inlets and pipe installation?
Answer
Date:
Question
Date:
8/7/2018 9:56:37 AM
Is Line Item 50 - Rock Excavation only for Sign Structures?
Answer
Date:
9/12/2018 3:44:24 PM
The rock excavation quantity is for installation of drainage structures where rock may be encountered.
Question
Date:
9/18/2018 6:07:05 PM
Does installation of Drainage structures mean the Drop inlets and pipe installation?
Answer
Date:
Subject:
RELOC. EXIST. SIGN STRUCT. TY. VA
Type:
Plan
Question
Date:
8/10/2018 3:17:37 PM
Need clarification on this pay item. Per the plans this is what it shows. Sheet No. 8(3), 8(4), 8(5), & 8(6) Show relocations of mile markers. Need pay items for type of posts and foundations for these relocates. Sheet No. 8(4) Show a two double posts signs. Need information on what is existing there and on what. These look like VIA type structure. Need pay items for type of posts and foundations for these relocates. Sheet No. 8(5) Show a single post sign. Need information on what is existing there and on what. Need pay items for type of posts and foundations for this relocate.
Answer
Date:
9/12/2018 2:40:25 PM
Paid for as “Reloc. Exist. Sign Struct. Ty. VA.” See Special Provision “Remove Salvage, and Relocate Existing Sign Structures and Sign Panels. No specific information regarding posts and foundations is available for existing signs. There is a variety of sign types within the project limits. All sign relocations are to be paid for as “Reloc. Exist. Sign Struct. Ty. VA.” See Special Provision “Remove Salvage, and Relocate Existing Sign Structures and Sign Panels.” No specific information regarding posts and foundations is available for existing signs. The pay item “Reloc. Exist. Sign Struct. Ty. VA.” Is intended to cover sign relocations under Special Provision “Remove Salvage, and Relocate Existing Sign Structures and Sign Panels.
Subject:
VA SIGN POST, W4X13
Type:
Proposal
Question
Date:
8/10/2018 2:41:10 PM
Need foundation pay item for these posts?
Answer
Date:
9/12/2018 2:40:44 PM
The pay item is item number 50486, Concrete Foundation STP-1, Type B.
Subject:
Permanent Signs
Type:
Plan
Question
Date:
8/10/2018 2:37:04 PM
The permanent sign schedule is incomplete. Need clarification on sign(s) measurements, foundation(s) type, and post(s) type?
Answer
Date:
9/12/2018 2:41:11 PM
The missing sign dimensions are to be added to the revised Sheet 8(1B).
Subject:
ACB design
Type:
Specifications
Question
Date:
8/10/2018 10:27:29 AM
The specification is based on a performance spec. Can the Virginia Department of Transportation let us know what Bend Coefficient should be used?Also, what factor of safety whoud be used in our design? Thank you
Answer
Date:
9/12/2018 2:41:47 PM
Bend Coefficient – 1.0 (For straight stream alignment) Factor of Safety – 1.5 min.
Subject:
Borrow Material
Type:
Plan
Question
Date:
8/9/2018 1:40:09 PM
In the General Notes, minimum CBR for Borrow is 5. In the Grading Summary it is listed as 8.9. Which is correct?
Answer
Date:
9/12/2018 2:42:10 PM
CBR value will be revised to 8.9 on the General Notes sheet.
Displaying questions 1 - 10 (of 25)
Page:
1
2
3
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/25/2024 4:49:06 AM
2008