Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
L89
109813
0029-000-859, C501, B605
1/19/2018
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
I-66 Toll Fees
Type:
Proposal
Question
Date:
1/17/2018 7:18:30 AM
Certain work activities will require travel on I-66. Will VDOT waive the I-66 toll fees for work associated with this project or will bidders need to carry toll costs in their bids?
Answer
Date:
1/18/2018 1:36:06 PM
The project footprint is completely outside I-66, tolling occurs when lane closures are not allowed. No exemption from tolling will be given.
Subject:
Added Item - Borrow Excavation
Type:
Bid Sheet
Question
Date:
1/12/2018 12:54:04 PM
Addendum #3 added a pay item for 2,001 CY of Borrow Excavation. Based upon the cross sections provided, there seems to be an excess of materials. Are the existing materials, identified for excavation unsuitable for fills? Can the Department provide a Grading Summary?
Answer
1 previous answer(s)
Date:
1/18/2018 1:38:47 PM
Please disregard previous answer. All excavated materials are assumed to be unsuitable.
Question
Date:
1/18/2018 2:13:51 PM
Please confirm that the Borrow Excavation pay item will compensate the replacement of trench spoils from storm drainage and water main that are not part of the pipe bedding standards or pavement section and for backfill materials excavated for structural excavation at the bridge and walls.
Answer
Date:
1/22/2018 1:39:37 PM
The borrow excavation will not compensate for the storm drain or water main trenches, walls or bridges. There are separate quantities for the structure work. The utility work is incidental to each utility.
Subject:
Temporary Safety Fence Anchored to Pavement
Type:
Plan
Question
Date:
1/11/2018 8:59:42 AM
Addendum #3 includes a new Special Provision page 277, which discusses ground mounted (18-Inch driven depth) and MB-11A mounted safety fence, but does not address temporary safety fence anchored to pavement, as is shown on many of the Suggested Sequence of Construction Plan Sheets. Will pavement anchored safety fence also be paid under Pay Item 0630-25560?
Answer
Date:
1/18/2018 11:00:33 AM
The answer is yes. Temporary Safety Fence shall be in accordance with Section 507 and the SPCN as submitted. The price shall include anchoring to pavement as necessary.
Subject:
Addendum #3 - Plan Sheet BPF-5
Type:
Plan
Question
Date:
1/11/2018 8:50:20 AM
Addendum #3 Special Provision Page 279 references Plan Sheet BPF-5, however this plan sheet does not appear to be included among the plans uploaded to the Falcon Website. Please identify what Plan Sheet number should be used for this reference.
Answer
Date:
Subject:
Buy American Requirement
Type:
Proposal
Question
Date:
1/4/2018 11:12:08 AM
Please confirm that Order L89 will not be required to comply with any Buy American, domestic materials requirements.
Answer
Date:
1/5/2018 2:11:18 PM
This is a state funded project, so no federal specs apply including Buy America.
Subject:
Curved Wall Forms
Type:
Other
Question
Date:
1/3/2018 2:22:05 PM
The bridge plans depict curved walls made up of various radii, made more complex by the tapered wall thicknesses. Will chorded formwork having a width of 48-Inches be permissible for the exposed faces of the longer radius elements (ie. Wall 1 - Zone 3B, Wall 2 - Zone 8 and Wall 3)? Will chord widths of 12-Inches be permissible for the exposed faces of the tighter radii (ie. Wall 1 - Zone 2B and Wall 2 - Zone 7)?
Answer
Date:
Subject:
Pay Item 2200-54261 PM 8' Character Ty B, Class I
Type:
Bid Sheet
Question
Date:
12/22/2017 3:51:28 PM
The Schedule of Items lists a quantity of 10 EA 8-Foot Long Pavement Marking Characters, however Plan Sheet 6J shows 27 EA 8-Foot Long Characters. Please check the quantity listed for this pay item.
Answer
Date:
12/28/2017 8:13:34 AM
Pavement markings are paid for per each message, not each character. The quantities are correct.
Subject:
Elongated Route 29 Shield
Type:
Plan
Question
Date:
12/22/2017 3:47:02 PM
Should a separate method of payment be established for the 7' x 15' Route 29 State Shield shown on Plan Sheets 6E and 6J?
Answer
Date:
12/28/2017 8:13:51 AM
No, the pavement marking are paid per each message-not each character and the Route 29 is included in the proposal line item 2200-704, Item ID Description 54261- 10EA
Subject:
Pedestrian Fence Coating Requirement
Type:
Plan
Question
Date:
12/19/2017 8:08:53 AM
Plan Sheets 9O and 9Q each discuss the fence post material coating, however two coatings are referenced. The Short Post General Notes and the Tall Post General Notes both include a bullet reading Finish: Stainless Steel with clear Lacquer Coating Use 11655 3.9 Clear Lacquer RFU and another bullet reading ...to ensure total coverage of Powder Coating. Please confirm that no Powder Coating is required.
Answer
Date:
12/28/2017 2:24:41 PM
The short and tall fence posts shall be stainless steel with clear lacquer coating. Use 11655 3.9 clear lacquer RFU. There is no powder coating. Notes on sheet 9O and 9Q will be revised in forthcoming addendum 3.
Subject:
Pedestrian Fence Electrical Continuity Detail
Type:
Plan
Question
Date:
12/19/2017 8:01:15 AM
The plans for the proposed Tall and Short Fence do not include the Electrical Continuity Detail (from VDOT Standard Plan Sheet BFP-5). Please confirm that this detail will not be a requirement as the proposed fence will not be vinyl coated.
Answer
Date:
12/28/2017 2:25:16 PM
Ground rod and electrode conductor will be required. The special provision for Pedestrian short and tall fence will be revised in forthcoming addendum 3.
Displaying questions 1 - 10 (of 68)
Page:
1
2
3
4
5
6
7
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/18/2024 3:05:06 AM
2008