Subject: Traffic Signal Phasing - Existing vs. Plan Type: Plan
Question Date: 9/21/2017 2:40:25 PM
There are a number of intersections along the corridor where the signal phasing in the field does not match the signal phasing shown on the plans. Is the intent of this project to modify all signal phasing to match the plans?  
Answer   Date: 10/13/2017 2:47:21 PM
The bid item for Modify Existing Controller includes rewiring the signal cabinet to reflect phasing as shown on the plans.  
 
Subject: Additional Pay Items - Sheet TS(4) Type: Plan
Question Date: 9/21/2017 12:59:08 PM
The following pay items are missing from the contract for Rte. 250 and Dickens Rd. - Loop Detector Amplifier (Dual Channel Card) & Spread Spectrum Radio. Unless the Department wants the existing amplifiers and radio relocated from the existing cabinet to the proposed cabinet. If this is the case, how will the contractor be compensated for relocating this equipment?  
Answer   Date: 10/13/2017 2:48:02 PM
The existing amplifiers and radio are to be relocated from the existing cabinet to the proposed cabinet and will be paid under Remove Existing Controller.  
 
Subject: Retroreflective Backplates Type: Plan
Question Date: 9/21/2017 12:55:06 PM
Please confirm that Retroreflective Backplates are required for all new signal heads installed under this contract.  
Answer   Date: 10/13/2017 2:48:34 PM
Retroreflective Backplates are required for all new signal heads installed under this contract. Retroreflective Backplates should be installed on all heads on arms where any one head is replaced. Backplates on any arms should not be mismatched.  
 
Subject: Lane Closures - West of Horsepen Type: Plan
Question Date: 9/19/2017 9:44:36 PM
Request the Department review the lane closure time periods for certain activities (i.e. pouring concrete). Can the Department allow for short duration closures to complete the concrete pours? Opening a concrete plant at night for these small quantities is very expensive.  
Answer   Date: 9/21/2017 2:25:38 PM
A review of the traffic data shows the plan can not support any additional lane closures.  
 
Subject: Measurement & Payment Descriptions Type: Proposal
Question Date: 9/19/2017 10:45:27 AM
Line 0670, 0680, 0690, 0700 do not have Measurement and Payment descriptions in the Special Provision for Remove, Relocate, Reuse, Install and Modify Existing Signal Equipment and Ground Mounted Sign Structures (see Pages 131 to 134 of the Bid Proposal).  
Answer   Date: 10/13/2017 2:49:09 PM
Removing designated items will be measured by the unit specified in the summary of quantities and the proposal and will be paid for at the contract unit price. Refer to 2016 VDOT Road and Bridge Specifications, Section 510.04, Section 703.03(c), Section 703.04.  
 
Subject: TS(8) - Video Detection - Phase 3 Type: Plan
Question Date: 9/19/2017 10:40:11 AM
There is already an existing video detection camera for Phase 3. It is attached to the mast arm for Pole A. Is the Department going to require a new camera to be installed on the mast arm for Pole D? If so, should the camera on Pole A be removed and how will that be compensated?  
Answer   Date: 10/13/2017 2:49:37 PM
Phase 3 Camera shall remain on Pole A. Video Detection Camera quantity was reduced for Intersection No. 6 on Summary of Quantity Plan Sheet TS(2)1.  
 
Subject: TS(6) - Connect Existing Conduits Type: Plan
Question Date: 9/19/2017 10:36:43 AM
Please provide a separate pay item for the connection of the existing conduits adjacent to Pole D. According to the plans, there are a number of cables that would have to be removed/rerouted to complete the conduit connection. Please provide specifications/details on the acceptable methods for connecting the existing conduits.  
Answer   Date: 10/13/2017 2:50:13 PM
Plans have been adjusted to remove existing JB at ~ Sta. 16+50 left and the proposed JB at ~ Sta. 17+75 has been deleted. A proposed 2” conduit from Pole D to the existing JB at ~ Sta. 17+25 has been added.  
 
Subject: TS(5) - Bored Conduit Type: Plan
Question Date: 9/19/2017 10:33:07 AM
Sheet TS(5) - The plan calls for 2" Bored Conduit (Conduit Label K). The summary sheet (TS(2)1) calls for 3" Bored Conduit. Please confirm the size of the conduit required.  
Answer   Date: 10/13/2017 2:50:41 PM
Plan Sheet TS(5) Conduit and Cable Legend has been updated to require 3” Bored Conduit for conduit labeled K.  
 
Subject: Existing Junction Box - Conduit Capacity Type: Plan
Question Date: 9/19/2017 10:31:51 AM
Sheet TS(4) - Please review the number of conduits (existing and proposed) that will be in the existing junction box next to the signal cabinet. Based on the existing size and number of conduits. Not sure there will be enough room for 3-3" and 3-2" conduits to be added to this box.  
Answer   Date: 10/13/2017 2:51:14 PM
Plan Sheet TS(4) Conduit and Cable Legend has been updated to eliminate concern for inadequate conduit capacity.  
 
Subject: Removal of Existing Wire Type: Bid Sheet
Question Date: 9/19/2017 10:23:59 AM
There are a number of plan sheets that require the removal of existing cables. How will the contractor be compensated for removing these cables?  
Answer   Date: 10/13/2017 2:57:03 PM
The connection of the existing conduits will be incidental to Line 0690. Removal will be paid under Remove Existing Conductor Cable as well as Relocate and Reuse Existing Conductor Cable. Summary notes have been added to the Summary of Quantities.  
 

Displaying questions 1 - 10 (of 15)