M17
87865
(NFO)0014-057-562,C-501,D-602
8/18/2017
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Permanent Sheet Pile Connection
Type:
Plan
Question
Date:
7/14/2017 4:27:36 PM
The plans call for the permanent sheet pile for the 7x4 box culvert to be positively attached to the box culvert and the existing wood bulkhead and connection detail to be submitted to VDOT for approval after award. This is difficult to bid if approval comes after bid. Would VDOT consider providing a connection detail to bid?
Answer
Date:
7/18/2017 1:26:23 PM
The department is not able to supply a connection detail. The detail for this connection will be subject to the means and methods of the selected precasting firm or contractor; therefore, the Contractor or precast supplier may propose their own connection dependent on their product design.
Subject:
Sidewalk/Curb Replacement
Type:
Plan
Question
Date:
7/14/2017 4:09:19 PM
The plans call for the sidewalks and curbs to be removed and replaced several times during the installation of the different drainage structures across Church Street, Main Street, and Buckley Hall Road. Do the sidewalks and curbs need to be poured back each time or can stone be brought to the finish grade and maintained until all work is completed with the culverts and HRSD work?
Answer
Date:
7/18/2017 1:24:57 PM
The Department and the Town is agreeable to permitting short term periods in which sidewalk gaps may be filled and maintained as compacted dense graded stone; however, work should be sequenced to avoid re-excavation of previously excavated locations and therefore minimize the sidewalks left as compacted dense graded aggregate. The Department notes that additional payment will not be provided should the contractor choose to excavate locations twice (e.g. once for vacuum sewer and once for drainage.)
Subject:
Working Hours
Type:
Proposal
Question
Date:
7/14/2017 3:59:08 PM
Can working hours be adjusted to round the clock 2-12 hour shifts in order to get culverts across Church Street, Main Street, and Buckley Hall Road?
Answer
Date:
7/18/2017 1:29:28 PM
Sorry but no. Allowable work hours will not be altered.
Subject:
Contaminated Soils
Type:
Bid Sheet
Question
Date:
7/14/2017 3:54:59 PM
The boring report indicates petroleum contaminated soils.Will there be a bid item added for this?
Answer
Date:
7/17/2017 4:30:25 PM
The soil is allowed by a VDEQ/VDOT agreement to be redeposited at its source or immediate vicinity. Hauling it is not necessary and a bid item will not be added.
Subject:
HRSD Tie Ins
Type:
Plan
Question
Date:
7/14/2017 3:49:54 PM
Will the HRSD work require shut downs for all tie-ins or will a tapping sleeve & valve be used for tie-ins?
Answer
Date:
7/17/2017 4:29:37 PM
Shut downs will be required for tie ins as a tapping sleeve & valve is not acceptable.
Subject:
Sheet Piles
Type:
Plan
Question
Date:
7/14/2017 3:46:34 PM
Is there a required depth that the permanent sheet piles need to be driven into the ground?
Answer
Date:
7/18/2017 4:10:56 PM
The Professional Engineer who completes the design for the size PZ-27 or equivalent sheet piles shall determine the design depth.
Subject:
Boring Logs
Type:
Other
Question
Date:
6/20/2017 10:32:59 AM
Were there any boring logs done on this project? If so, could the prospective contractors obtain a copy of them?
Answer
Date:
6/20/2017 11:30:11 AM
They are posted on the Construction Home page under ANNOUNCEMENTS.
Displaying questions 1 - 7 (of 7)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/26/2024 4:13:54 PM
2008