Question
|
|
Date:
|
5/22/2017 8:24:37 AM
|
Can you please provide a Specification for the SNMO/HTTP EXTERNAL ADAPTOR. Is this item description correct or should it be SNMP/HTTP EXTERNAL ADAPTOR?
|
Answer
|
Date:
|
5/22/2017 9:11:05 AM
|
The SNMO/HTTP EXTERNAL ADAPTOR description is incorrect and should be SNMP/HTTP EXTERNAL ADAPTOR. Due to the lateness of this discovery, no addendum can be issued, but the item description will be changed in BidX. Bidders will need to download a new BidX file on Monday(today) after noon. The Special Provision for UNINTERRUPTIBLE POWER SUPPLY in the proposal will apply for this item.
|
|
|
Question
|
|
Date:
|
5/16/2017 8:45:58 PM
|
Please provide clarification on the need for vehicle detection during construction. Note 6 on Sheet 1J states "Allow signal to run on a pre-timed sequence until loop detection can be installed during Phase VI MOT." Note 1 on Sheet 9(2) states "Contractor shall maintain vehicle detection on all signal phases throughout the duration of construction."
|
Answer
|
Date:
|
5/19/2017 2:01:35 PM
|
Disregard the note on sheet 1J. As part of the temporary signalization of the intersection follow Note 1 on sheet 9(2). "Contractor shall maintain vehicle detection on all signal phases throughout the duration of construction."
|
|
|
Question
|
|
Date:
|
5/15/2017 2:01:26 PM
|
Plan sheet 9(2) denotes Retroreflective backplates for plan sheet 9(3) and bid item 0980/51184 does not specify these type of backplates. What does VDOT want on this project?
|
Answer
|
Date:
|
5/19/2017 11:55:09 AM
|
Backplates shall be retroreflective as noted in the plans and in accordance with contract special provisions Section 703 Traffic Signals (Retroreflective Backplates).
|
|
|
Question
|
|
Date:
|
5/15/2017 1:58:49 PM
|
There is no bid item for 14/1 Enclosed Conductor Cable which is required for the loop detectors. Will this be handled via work order or added in an addendum?
|
Answer
|
Date:
|
5/18/2017 1:24:18 PM
|
The 14/1 Enclosed conductor cable will be added via work order after award.
|
|
|
Question
|
|
Date:
|
5/12/2017 12:16:40 PM
|
Per the Summary of Quantities (Sheet 8(2)), the Sign Post STP-1, 2-1/2", 10 GA. posts will be installed on Concrete Foundation, STP-1, Type F.
Per Standard 1321.18, only 2" 14 GA. posts shall be installed on Concrete Foundation, STP-1, Type F. Please provide clarification.
|
Answer
|
Date:
|
5/17/2017 9:48:43 AM
|
The STP-1, 2-1/2”, 10 GA. Posts will be installed on Concrete Foundation STP-1, Type B. This will be handled by a work order after award.
|
|
|
Question
|
|
Date:
|
5/12/2017 12:12:37 PM
|
Sheet 8(2A)1 shows that Signs 503 & 302 should be installed on 2-1/2"-12 GA Posts with Type A foundations. However, the Summary of Quantities (Sheet 8(2)) and the Bid proposal have no pay items for 2-1/2" - 12 GA. posts and STP-1, Type A foundations. Please provide clarification on these pay items.
|
Answer
|
Date:
|
5/17/2017 9:47:30 AM
|
Signs 302 & 503 will require Sign Post STP-1, 2-1/2”, 12 Gauge and Concrete Foundation STP-1, Type A. This will be handled by work order after award.
|
|
|
Question
|
|
Date:
|
5/17/2017 1:09:13 PM
|
Sign to be relocated From Station 115+38(+/-) is a solar panel signs, normally the foundations for this type of sign is larger than a Type A as stated on plan sheet 8(3). Can the department confirm the size of this foundation?
|
Answer
|
Date:
|
5/19/2017 2:00:52 PM
|
Type A foundation is the appropriate foundation.
|
|
|
Question
|
|
Date:
|
5/12/2017 12:12:32 PM
|
Sheet 8(2A)1 shows that Signs 503 & 302 should be installed on 2-1/2"-12 GA Posts with Type A foundations. However, the Summary of Quantities (Sheet 8(2)) and the Bid proposal have no pay items for 2-1/2" - 12 GA. posts and STP-1, Type A foundations. Please provide clarification on these pay items.
|
Answer
|
Date:
|
5/17/2017 9:47:50 AM
|
Signs 302 & 503 will require Sign Post STP-1, 2-1/2”, 12 Gauge and Concrete Foundation STP-1, Type A. This will be handled by work order after award.
|
|
|
Question
|
|
Date:
|
5/17/2017 1:09:13 PM
|
Sign to be relocated From Station 115+38(+/-) is a solar panel signs, normally the foundations for this type of sign is larger than a Type A as stated on plan sheet 8(3). Can the department confirm the size of this foundation?
|
Answer
|
Date:
|
5/19/2017 2:00:52 PM
|
Type A foundation is the appropriate foundation.
|
|
|
Question
|
|
Date:
|
5/9/2017 11:11:08 AM
|
The arms shown on plans & on bid list are 55' & 70' for the single arms; however the shaft shown on the bid list for the single arm is a Type A (Per specs. max arm length for Type A is 49') should the line # 1020 be a Type B1 shaft?
|
Answer
|
Date:
|
5/12/2017 1:28:24 PM
|
This will be handled by work order after award.
|
|
|
Question
|
|
Date:
|
5/15/2017 10:34:32 AM
|
Please review the mast arm length needed for Pole C. The legend calls for a 55' mast arm. However when you scale the mast arm in the plan view, it is under 49'. This would allow for a Type A shaft to work for Pole C. We would request that these items be addressed in an Addendum instead of a work order after award.
|
Answer
|
Date:
|
5/18/2017 1:45:06 PM
|
The correct mast arm length is 55’. This length allows the signal head to line up with the turn lane plus a minimum 1’ extension of the mast arm beyond the last signal head.
|
|
|
Question
|
|
Date:
|
5/1/2017 1:34:11 PM
|
Please confirm whether pole design is 1994 AASHTO as indicated in proposal/plans or 2013 AASHTO as indicated per bid items. Plan sheet 1 indicates 2016 Road and Bridge.
|
Answer
|
Date:
|
5/8/2017 10:51:44 AM
|
Pole design shall conform to 2016 Specifications. An addendum updating Section 700 Special Provision accordingly will be issued.
|
|
|
Question
|
|
Date:
|
4/27/2017 1:42:43 PM
|
What type of geogrid is required for bid item 60?
|
Answer
|
Date:
|
5/3/2017 1:38:57 PM
|
The geogrid shall be made from High-Density Polyethylene (HDPE) or Polypropylene (PP). Polyester (PET) geogrids will not be allowed. A Special Provision for Geogrid Subgrade Stabilization will be added to the bid documents via addendum.
|
|
|
Question
|
|
Date:
|
4/27/2017 1:24:00 PM
|
The Soil modification bid item is referenced in the proposal, but the payment says it will be made for lime and modification. There is no pay item for lime, but there is a total amount in the grading diagram and summary. How will the lime be paid for? Please clarify.
|
Answer
|
Date:
|
5/2/2017 8:12:46 AM
|
Lime is listed in the Schedule of Items as Item ID #10000 (Proposal Line Number 0440), Lime at 230 tons.
|
|
|