Subject: Missing Items from Bid sheet Type: Bid Sheet
Question Date: 3/15/2017 3:17:09 PM
A3 concrete isn't included as a bid item, is this an error?  
Answer   Date: 3/17/2017 10:35:58 AM
No incidental concrete will be needed.  
 
Question Date: 3/15/2017 3:15:09 PM
Rebar isn't included on the schedule of items within the bid sheet. The rebar itself, is used for tie ins, is this an error?  
Answer   Date: 3/17/2017 10:36:51 AM
No tie-in to inlets should be needed.  
 
Question Date: 3/15/2017 3:11:20 PM
Road and Bridge Spec 2016 Sec. 603 states. That lime and fertilizer are to be separate bid items; however lime and fertilizer isn't included as a bid item.  
Answer   Date: 3/17/2017 10:44:32 AM
The cost of any turf restoration shall be included in the price bid for other items.  
 