Subject: Public Communication Plan Type: Other
Question Date: 4/24/2017 11:46:33 AM
There is no reference in the documents to the PCMS as to how many, how long ahead of the job start date, or message required. No Public Communication Plan was found. Bid item requires 700 Hours. Please advise on the missing information for this item.  
Answer   Date: 4/25/2017 3:27:10 PM
Contractor should expect to supply the PCMS for 700 hours. There is no formal communication plan. The usage shall be decided during the meetings with the Department.  
 
Subject: Topsoil Type: Bid Sheet
Question Date: 4/20/2017 1:40:22 PM
There does not appear to be a top soil pay item on the bid sheet. How will topsoil be measured and paid for on this project? Is it class A or class B?  
Answer   Date: 4/24/2017 2:00:24 PM
No additional topsoil is anticipated for this project. Contractor shall include reuse of onsite topsoil in bid.  
 
Subject: New Signage Type: Bid Sheet
Question Date: 4/19/2017 8:07:24 AM
The bid sheet is missing a line item for sign panels  
Answer   Date: 4/24/2017 1:59:40 PM
Sign panels shall be included in the bid item for MOT (Lump Sum).  
 
Subject: Geogrid Reinforcement Product Clarification Type: Other
Question Date: 4/12/2017 10:15:45 AM
Drawing 2A in the detail specifies "Biaxial Geogrid Reinforcement" while the bid proposal item 0220 calls for "Geoweb Cellular Confinement Biaxial Geogrid Reinforcement". There are not the same product, please clarify which product you want.  
Answer   Date: 4/14/2017 2:39:53 PM
An addendum will be published today.  
 
Subject: ENVIRON. PROTECTION ONTAMINATED SOIL AND DISPOSAL Type: Proposal
Question Date: 3/23/2017 1:55:59 PM
Proposal says contaminated soil to be disposed, as SPECIALSOLID WASTE. As it is contractor's responsibility to sample and analyze soil, If contractor's analysis shows soil contains hazardous levels, how will VDOT address this? noting SPECIAL and HAZARDOUS have signifigantly different disposal costs.. note G-5 on page 2 of plans mentions previously conducted subsurface soil investigation. Can this investigation results be shared with bidders?  
Answer   Date: 4/4/2017 10:33:22 AM
The Phase 2 Environmental Site Assessment (report) found the contaminated soil to be solid waste and can be disposed of as special solid waste. No evidence of hazardous waste was found during the investigation. The report will be uploaded to the Construction Division Website.  
 
Subject: Duplicate Bid Items Type: Proposal
Question Date: 3/17/2017 12:04:04 PM
Line Items 90 and 100 are both for Aggregate Base Mtrl No 21B. but different quantities. Is this an error?  
Answer   Date: 3/17/2017 3:14:04 PM
Note that 287 Tons of Ty I. No. 21 B stone is listed in the incidental summary table designated for Ground Improvement and 1396 Tons Ty. I. No. 21B stone in the pavement summary table for the roadway base. Please price accordingly.  
 