Project Info
Order Number UPC State Project Number Last Date to Post Questions
L67 94722 (NFO)0043-009-730,C501,B612 4/21/2017
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Item Sheet Type: Bid Sheet
Question Date: 4/19/2017 4:12:38 PM
Can you post the full bid sheet for this project? Only the last page is posted.  
Answer   Date: 4/21/2017 2:41:47 PM
Will do.  
 
Subject: Cover Depth Survey Type: Bid Sheet
Question Date: 4/19/2017 10:17:52 AM
Could you direct me to the specification for Item 60495 Cover Depth Survey, or clarify what is required?  
Answer   Date: 4/21/2017 4:02:46 PM
Cover Depth Survey is covered in the 2016 Road and Bridge Specifications on page 478, Section 404.04 (a).  
 
Subject: Regular Excavation Type: Proposal
Question Date: 4/13/2017 10:04:41 AM
The bid item for Regular Excavation in the proposal and on Bid Ex is 1015 CY but the summary in the plans is 8.5 CY. Please clarify  
Answer   Date: 4/18/2017 10:58:56 AM
On Sheet 2F of the plans, under Incidental Summary there is a quantity for Regular Excavation of 835 CY. Also on sheet 2F under Maintenance of Traffic Summary also shows a quantity for Regular Excavation of 180 CY. Which is a total of 1,015 CY of Regular Excavation as shown on the proposal.  
 
Question Date: 4/13/2017 10:48:54 AM
Please provide a grading summary  
Answer   Date: 4/18/2017 10:56:26 AM
No grading summary was developed for this project. It is mostly Borrow Excavation.  
 
Subject: Additional Rock Excavation If Footings are Lowered Type: Bid Sheet
Question Date: 4/12/2017 9:25:45 AM
During the excavation and discovery of the actual elevation of the rock, the bottom of the footing elevation may be lowered to assure that all of the footing is embedded at least 12" into the rock. This could result in additional rock excavation. How will the Contractor be paid for this excavation?  
Answer   Date: 4/21/2017 3:59:06 PM
After all material is removed to the elevation of the rock, VDOT will evaluate the rock to determine if it is competent rock. At that time, if any additional material is to be removed, it will be paid for a Structure Excavation.  
 
Subject: Bridge Footings in Rock Type: Bid Sheet
Question Date: 4/12/2017 9:23:33 AM
The bridge footings are to be embedded 12" into the rock but the boring logs indicate that the rock is sloped under the proposed footings. As the footings are level, that would indicate that a majority of the excavation into the rock will be over 12" and some as deep as 6'-0" (Pier 2). How will the Contractor be paid for this additional rock excavation?  
Answer   Date: 4/21/2017 3:58:18 PM
After all material is removed to the elevation of the rock, VDOT will evaluate the rock to determine if it is competent rock. At that time, if any additional material is to be removed, it will be paid for as Structure Excavation.  
 
Subject: Traffic Barrier Connection to Prestressed Slabs Type: Plan
Question Date: 4/12/2017 9:21:18 AM
On sheet 4 of 28 of the bridge drawings, it is indicated that the traffic barrier is connected to the new bridge deck by bolts extending through the prestressed concrete slab. Is there not a possibility that during the drilling of the holes through the slab that a bolt may hit the prestressed tendons?  
Answer   Date: 4/18/2017 10:57:43 AM
On similar projects, the fabricators have inserted sleeves through the prestressed slabs to allow for the full depth bolts for the traffic barrier service.  
 
Subject: Traffic Control Type: Other
Question Date: 4/11/2017 4:18:44 PM
Can the traffic signal be a trailer mounted unit?  
Answer   Date: 4/18/2017 10:56:58 AM
On sheet 1F(2A), Note 11 of the plans states "No portable traffic signals will be allowed at this location."  
 
Subject: Existing Structure Plans Type: Plan
Question Date: 4/4/2017 9:32:33 AM
Please post the existing structure plans on CABB or Falcon.  
Answer   Date: 4/11/2017 2:08:35 PM
They will be posted on the Construction webpage under ANNOUNCEMENTS  
 