Subject: existing conduit & cable Type: Plan
Question Date: 4/20/2017 1:04:20 PM
Who will be responsible for verifying the condition of the existing conduit and cable that is to be reused for the traffic signal?  
Answer   Date: 4/24/2017 2:12:45 PM
VDOT is responsible.  
 
Subject: Signal Heads Type: Plan
Question Date: 4/20/2017 1:03:19 PM
What kind of signal heads are currently at the intersection? We will need to know this so we can get pricing for the new heads in order for them to match.  
Answer   Date: 4/21/2017 4:30:31 PM
Regardless the existing type, the new signal heads on the affected approach (Brookwoood Dr Northbound) should have polycarbonate housing and polycarbonate reflective backplates (HVSBs) to reduce the load on the existing arm.  
 
Question Date: 4/20/2017 1:05:03 PM
Will reflective backplates be required for this project?  
Answer   Date: 4/21/2017 4:13:54 PM
Yes, reflective backplates will be required for the affected approach  
 
Subject: Signal Poles and Foundations Type: Other
Question Date: 4/20/2017 1:02:13 PM
Please clarify who will be responsible for verifying that the loading will be in compliance with the modifications requested on the existing traffic signal.  
Answer   Date: 4/21/2017 4:29:50 PM
The existing pole is a VDOT regional pole and its loading capacity can accommodate the proposed modification.  
 