Project Info
Order Number UPC State Project Number Last Date to Post Questions
L61 109645 U000-123-295,N501 4/21/2017
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Asphalt Patching Type: Proposal
Question Date: 4/20/2017 10:38:13 AM
The asphalt patching shown on page 61, has the square footage and not the size or with of the patching. Will VDOT allow the contractor to use the same size equipment it has on site to do the patches 7' milling and 8' paver ?  
Answer   Date: 4/25/2017 1:14:00 PM
Yes, VDOT will allow the same size equipment provided it can accommodate a minimum patch width of 7 feet.  
 
Subject: Loop Detector Pay Items Type: Specifications
Question Date: 4/19/2017 10:53:19 AM
1-31-17 (SPCN) details directional drilling as part of Remove and Replace (size) Detector Loop. Is this in reference to the possibility of 1" conduit required to connect the loop to the existing junction box? Or is VDOT anticipating bored conduit between existing junction boxes?  
Answer   Date: 4/25/2017 10:26:10 AM
VDOT does not anticipate bored conduit between existing junction boxes. Directional boring was included as an alternative option to trenching for the contractor to connect the loop to the existing junction box.  
 

Displaying questions 1 - 2 (of 2)