Subject: Concrete material Type: Plan
Question Date: 3/17/2017 4:21:00 PM
Note on Plan Sheet 1 States: "All concrete in Piers and Abutments shall be self-consolidating." Is this intended for the substructure repairs, or all concrete to be placed in the substructure including the new seat areas and wingwalls?  
Answer   Date:
 
 
Subject: Concrete Substructure Surface Repair Type: Specifications
Question Date: 3/17/2017 4:17:17 PM
Will the department allow the use of shotcrete for these repairs?  
Answer   Date: 3/20/2017 10:54:07 AM
Shotcrete will not be allowed for repairs. All concrete in substructure, including substructure surface repairs, abutment wings, and pier caps, shall be self-consolidating concrete.  
 
Subject: Existing Bridge Plans Type: Plan
Question Date: 3/8/2017 10:54:19 AM
Would you be able to make the existing bridge plans/asbuilt drawings available? There are some critical dimensions not indicated in the new drawings.  
Answer   Date: 3/9/2017 9:19:11 AM
Existing plans have been loaded to Falcon  
 
Subject: Bid Item Quantity Type: Bid Sheet
Question Date: 3/3/2017 1:18:34 PM
Please verify the location and depth of Item 60, BM-25.0A. The bid quantity appears to be much larger than the scope of work shown on the plans.  
Answer   Date: 3/9/2017 8:59:03 AM
The majority of the BM-25.0A quantity comes from the variable depth overlay, which is used to raise the existing grade 0-11” on all four ramps and F-310 approaching the proposed structure. Per the pavement legend note on sheet 28c the profile should be used to calculate the required overlay depth along the F-310 approaches to the bridge structure. The profiles on sheets 28g and 28h provide the proposed and existing ground elevations necessary to determine the overlay depth at a given point along any alignment. Additional BM-25.0A material quantity comes from the MC-4 paving required under the guardrail at the north end of the F-310 structure.  
 