Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
K55
97193
(NFO)0850-081-744, M501, D681
10/21/2016
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Unreinf Conc Column Plan Sheet 9 "STAR" Note
Type:
Plan
Question
Date:
10/20/2016 4:18:14 PM
Please take a look at how an unreinforced, free standing, 12 ft +/- tall concrete column that will have to withstand live load conditions will be able to retain the #57 fill without failure or safety risk to the contractor's personnel and travelling public. I do not think this would be allowed if it was a contractor design.
Answer
Date:
10/24/2016 4:03:44 PM
This is a good observation. This is typical detail that we use for box culverts were we count on the friction between the concrete column with the box unit, and with existing abutment stem wall. However because of the height of the column we suggest providing ½” single row of wedge anchors @ 16” o.c. with minimum 4” projection anchored to the full height of the abutment stem wall above the diversion pipes; embedded according to manufacturer specifications. Price of additional work and material mentioned above shall be included in the price of # 57 stone for both projects Rte. 850 over Bratton Creek and Rte. 850 over Kerrs Creek.
Subject:
Temp Signals
Type:
Specifications
Question
Date:
10/20/2016 3:57:57 PM
Will temporary/trailer mounted signal systems be acceptable on this project? There is a significant cost savings to the Commonwealth.
Answer
Date:
10/24/2016 11:27:32 AM
Trailer mounted signals will NOT be allowed due to extended time they will be in use.
Subject:
Bid Items 340, 350, 360
Type:
Plan
Question
Date:
10/20/2016 1:46:45 PM
Please clarify the types and bid quantities for these three Traffic Barrier Service items. The types and quantities listed on the bid form are not consistent with the traffic plans nor phasing/sequence plans (sheet 8) in the structure sections.
Answer
Date:
Subject:
Bid Item 440 Fertilizer
Type:
Bid Sheet
Question
Date:
10/20/2016 11:48:36 AM
Please verify the Bid Qty and U/M. It currently lists .03 LB. Should the U/M be TONS?
Answer
2 previous answer(s)
Date:
10/24/2016 4:01:30 PM
The unit of measure should be pounds as shown in the new 2016 Road and Bridge Standards Bidders are advised to bid $0.00 (zero) on item 27215 for line number 0440.
Subject:
Item 410 Topsoil Class B
Type:
Bid Sheet
Question
Date:
10/20/2016 11:45:34 AM
Please verify whether the bid item U/M is "CY" or "ACRE".
Answer
2 previous answer(s)
Date:
10/24/2016 4:02:19 PM
The unit if measure should be acre. The contractor is advised to bid $0.00 (zero) on item 27023 for line number 0410
Subject:
CBR10 Location - Kerr's Creek
Type:
Plan
Question
Date:
10/18/2016 5:06:50 PM
Sheets 2A and 2C Where is the CBR-10 required, 240 CY in the qty summary on 2C. This qty is similar to calculated qty utilizing VDOT plan notes for RSS Retained Earth Zone on plan 2A. Is it VDOT's intent to pay for the RSS Retained Zone as CBR-10, Unit Price or is the zone incidental to the RSS item as noted in the Special Provision? Please clarify.
Answer
Date:
10/21/2016 11:48:23 AM
See call out on sheet 3, “Backfill in this area to be CBR 10, see bridge sheets for details.”
Subject:
Reinforced Slope Stabilization
Type:
Plan
Question
Date:
10/18/2016 5:01:14 PM
Plan Sheet 2A. RSS Stationing breaks on Left from 102+50 to 102+75. What gets built in this 25 ft zone between the 1.5:1 and 0.5:1 transition between the RSS Wall zones?
Answer
Date:
10/20/2016 3:54:36 PM
A transitioned RSS slope from 1.5:1 to 0.5:1.
Subject:
Temporary Signal
Type:
Plan
Question
Date:
10/18/2016 7:03:17 AM
Will the use of trailer mounted temporary signals be allowed?
Answer
Date:
10/21/2016 11:50:33 AM
Trailer mounted signals will NOT be allowed due to extended time they will be in use.
Subject:
Kerr's Creek
Type:
Plan
Question
Date:
10/4/2016 3:53:56 PM
Please post the plans for the culvert over Kerr's Creek on Falcon.
Answer
Date:
10/7/2016 6:03:24 PM
Plans for Kerrs Creek are located in Falcon Websuite under UPC 97194.
Question
Date:
10/19/2016 6:51:32 AM
Kerr's Creek Box plans are not on the site. Only the Bratton Creek box culvert is on the site.
Answer
Date:
Question
Date:
10/18/2016 4:27:41 PM
UPC 97193 only has the plans for the box culvert on Bratton Creek and not Kerr's Creek. There are only 47 pages of the plans on Falcon.
Answer
Date:
Question
Date:
10/18/2016 2:40:28 PM
Can not find UPC 97194 on Falcon site. UPC 97193 is there.
Answer
Date:
10/18/2016 4:22:33 PM
It's the same project.
Displaying questions 1 - 9 (of 9)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/24/2024 8:54:40 AM
2008