Project Info
Order Number UPC State Project Number Last Date to Post Questions
K35 104665 (NFO)0001-043-S96,C501 9/23/2016
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Time Limit on Job Type: Proposal
Question Date: 9/23/2016 12:46:15 PM
The Time limit on the job is 8/2017 however Item 24278 Group 2 Channelizing Devices has a Quantity of 3030 Days is this correct?  
Answer   Date: 9/26/2016 2:41:09 PM
The estimated quantity for Item 24278 Group 2 Channelizing Devices is correct at 3,030 days.  
 
Question Date: 9/26/2016 2:08:21 PM
Is this question going to be answered?  
Answer   Date: 9/26/2016 2:41:18 PM
Done  
 
Subject: Pedestrian Pushbutton Pay Items Type: Bid Sheet
Question Date: 9/16/2016 10:29:01 AM
There are pay items for Pedestrian Actuation PA-2 & PA-3 as well as Accessible Ped Pushbutton PA-2 & PA-3. Please clarify the intent of these pay items  
Answer   Date: 9/22/2016 3:20:07 PM
The accessible Ped. Pushbutton PA-2 and PA-3 are the items that are needed for these two locations. These items provide the audible sound that is currently used on the west side of the intersections for both locations. The Ped. Actuation PA-2 and PA-3 pushbuttons (Item #s 51198 and 51199) are to be disregarded.  
 
Subject: Emergency Preemption 3-Way Type: Plan
Question Date: 9/16/2016 10:28:21 AM
Plan Sheet 5(4)- Pay item is for Emergency Preemption 3-way. The plan shows 2 relocated EVP units and 1 new unit on pole D. Does VDOT want 3 new EVP units?  
Answer   Date: 9/22/2016 3:12:28 PM
Yes, contractor shall provide 3 new units and return the two used EVP units to VDOT. They will be returned back to the Traffic Signal shop for future use.  
 
Subject: Existing Controller Cabinet Foundation Type: Plan
Question Date: 9/16/2016 10:27:38 AM
Plan Sheet 5(3)- Existing Controller Cabinet & CF-1 foundation to remain, “Contractor to install the concrete maintenance pad”. How is this going to be paid?  
Answer   Date: 9/22/2016 3:05:41 PM
This item will be paid for under item # 00525 - Miscellaneous Concrete.  
 
Subject: DVP Coordination/Payment Type: Plan
Question Date: 9/16/2016 10:26:59 AM
Plan Sheet 5(1) Note 21- states the Contractor is responsible for coordination with DVP for de-energizing power lines. Is VDOT paying associated costs for the de-energizing?  
Answer   Date: 9/22/2016 3:04:14 PM
VDOT is paying DVP for the cost of de-energizing the lines. No additional payment will be made to the contractor for coordination.  
 
Subject: 0540 Electrical Service SE-5 Type: Plan
Question Date: 9/13/2016 4:03:48 PM
This line item in the schedule of items refers to spec 700 however in the plans on sheet 5(1A)11 shows a different detail for the SE-5. Please clarify the installation method.  
Answer   Date: 9/14/2016 3:46:35 PM
This is the version of the SE-5 VDOT prefers. Please supply this product.  
 
Subject: 1010 TS Remove and Install Pedestrian Pedestal Pole Type: Specifications
Question Date: 9/13/2016 4:00:56 PM
Please provide special provision and a description of what is included in this pay item.  
Answer   Date: 9/14/2016 3:45:12 PM
Sheet 5(2)2 Note 18 states that the pay item will be for removing pedestal pole and reinstalling the existing pedestal pole due to drainage work taking place in that area. What is missing?  
 
Question Date: 9/20/2016 12:40:36 PM
Is this going on a new pedestal pole foundation or the existing foundation? If it is a new one do we take out the old foundation and if it is new one how will it be paid? If they are doing drainage work will the foundation and existing conduit and/or cables need replaced? If so, how will this be paid?  
Answer   Date: 9/22/2016 3:38:23 PM
There will likely be a new foundation required because the old foundation may be destroyed by drainage work. This could include the replacement of conduit/cables that might be destroyed as well. All work will be included in the Remove and install pedestal pole.  
 
Subject: Test Bore Type: Other
Question Date: 9/13/2016 3:56:45 PM
Please clarify who will be providing test bores for the signal poles. There is no pay item in the contract.  
Answer   Date: 9/14/2016 3:47:42 PM
VDOT has obtained the test bores for both locations, Rte. 1 & Wilkinson Rd. and Rte. 1 & St. Joes Villa Ent.  
 
Question Date: 9/20/2016 12:41:47 PM
Will VDOT provide the foundation design as well?  
Answer   Date: 9/22/2016 3:50:25 PM
No, VDOT will not be providing the foundation design.  
 
Subject: 0810 Install Video Detection Equipment (Aldis) Type: Specifications
Question Date: 9/13/2016 3:55:57 PM
Please clarify components for Aldis Equipment and who will be providing equipment.  
Answer   Date: 9/14/2016 3:47:13 PM
Signal Asset Group will be purchasing the equipment and the Contractor will be installing the equipment. There is a note on the Summary of quantity sheet 5(2)3 Note 17 that describes these items the Contractor will install.  
 
Subject: 0800 Install Controller and Cab. Equip. Type: Specifications
Question Date: 9/13/2016 3:54:27 PM
Special provisions specify new equipment and drawings (sheet 5(2)1) specify new equipment in existing cabinet. Please clarify new versus existing equipment.  
Answer   Date: 9/14/2016 3:48:12 PM
The Rte. 1 and Wilkinson Rd. has an existing Control box that will used and new equipment to be installed by the Contractor such as Controller, loop amplifiers, video detection equipment, emergency preemption equipment, spread spectrum equipment.  
 
Question Date: 9/20/2016 12:43:32 PM
Will new detector rack be required? There are line items for all of the new equipment to be installed into the existing cabinet except for the controller. Is VDOT supplying the controller or should there be a line item added?  
Answer   Date: 9/22/2016 3:40:22 PM
A detector rack is already in place in the new Controller Cabinet for this location. The Contractor will reuse the existing Controller and relocate it to the existing empty Controller Cabinet.  
 

Displaying questions 1 - 10 (of 10)