    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Spec Section 512.04 Type: Specifications
Question Date: 9/22/2016 7:53:30 AM
Section 512.04 states the following items will be paid at rates specified in this section. Flagger $15.00 Per HR Pilot Vehicles $23.00 Per HR Electronic Arrows $5.00 Per HR Group 2 Channelizing Devices $1.00 Per Day Etc.... Please advise if the items in this section will be paid at the unit price bid or will they be paid at the set rates in this section of the spec.  
Answer   Date: 9/22/2016 2:58:41 PM
That is for use when the contract has no price for the items.  
 
Subject: BidX Items Type: Proposal
Question Date: 9/20/2016 1:22:03 PM
BidX is missing Bid Items 990 thru 1070 please advise.  
Answer   Date: 9/20/2016 3:43:25 PM
Revised  
 
Question Date: 9/20/2016 1:28:46 PM
Sorry all were deleted by revision.  
Answer   Date: 9/20/2016 3:43:35 PM
Revised  
 
Subject: Lump Sum Items Type: Bid Sheet
Question Date: 9/9/2016 10:38:44 AM
With this project being task order driven should the following items be paid as each for bidding purposes? Maintenance of Traffic, Remove Exist. Rem/Disp Signal Equipment, and Traffic Signalization Maint. of Existing Signals  
Answer   Date: 9/13/2016 3:40:08 PM
An addendum will be issued revising methods of payment for Maintenance of Traffic, Traffic Signalization Maint. Of Existing Signals.  
 
Question Date: 9/20/2016 10:12:53 AM
For a task order driven contract Remove Exist. Rem/Disp Signal Equipment how is this item paid as lump sum? Should this item be each?  
Answer   Date:
 
 
Subject: SE-5 Electrical Service Type: Plan
Question Date: 9/9/2016 10:36:06 AM
SE-5 electrical service states refer to spec 700 but there is a plan page for an SE-5 requiring a control center. Please clarify which SE-5 service will be required.  
Answer   Date: 9/13/2016 3:38:11 PM
The lighting control center is “as noted on plans”. No control center is needed for this project, as nothing is noted on the plans. The SE-5 should conform with both section 700 and the detail drawing.  
 
Subject: Fiber Splice Type: Bid Sheet
Question Date: 9/9/2016 10:34:25 AM
Please clarify size of fiber to splice. Should a line item be added for fiber?  
Answer   Date: 9/13/2016 3:39:00 PM
VDOT will be issuing and addendum to clarify any bid items related to fiber.  
 
Subject: Work Hours Type: Plan
Question Date: 9/6/2016 4:44:26 PM
Drawing 1F specifies the Lane Closure time frames as night work. Can all other work be performed during the day that doesn't require a lane closure?  
Answer   Date: 9/13/2016 3:39:34 PM
Yes, other work can be completed outside of the hours on sheet 1F that does not require lane closures.  
 