Project Info
Order Number UPC State Project Number Last Date to Post Questions
C91 93304 (NFO) U000-109-179, M501, B602 9/23/2016
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: In-stream Work Type: Permits
Question Date: 9/22/2016 11:16:30 AM
Permit conditions state that all in stream work shall be performed in the dry. Will cofferdams / sheeting be required for construction of the bridge as well as installation of the water and sewer line? If so, will blocking the tributary be allowed?  
Answer   Date: 9/26/2016 2:45:15 PM
a.) The work done to construct the bridge abutments will be behind the existing substructures of the existing bridge. Therefore, the bridge work should already be in the dry and there should be no need for cofferdams or sheeting. If work occurs during time of no flow/stagnant water, then no cofferdams, stream channel retaining structures or dikes, will be required. If work occurs during time of stream flow, then cofferdams, stream channel retaining structures, and all dikes (constructed of non-erodible materials), will be required.~~~~ b.) Blocking of short duration, with appropriate pump around, shall be required in order to adhere to specification 107.16(b) “The contractor shall prevent stream constriction that would reduce stream flows below the minimum….during construction operations.” and, “The Contractor to the maximum extent practicable shall not permanently restrict or impede the passage of normal or expected high flows or cause the relocation of the water.”. The intent of these portions of the specification is to ensure that downstream habitats and aquatic species are not starved of flowing water.  
 

Displaying questions 1 - 1 (of 1)