Subject: Undercut Type: Plan
Question Date: 6/15/2016 10:22:20 AM
There appears to be an area under the #1 aggregate that needs to be excavated for the stone installation. Is this amount in the grading summary? If not how would we get paid for this work.  
Answer   Date: 6/17/2016 11:26:13 AM
Due to lateness of this discovery, any addendum issued at this time would necessitate delay of bids. If a change is needed, it will be handled via post-award.  
 
Subject: Grading Items Type: Plan
Question Date: 6/14/2016 10:16:04 AM
Where does channel excavation fit into the grading summary. How do we get paid for this item  
Answer   Date: 6/15/2016 3:05:29 PM
Due to lateness of this discovery, an addendum now would necessitate delay of bids. If a change is needed, it will be handled post award.  
 
Question Date: 6/14/2016 10:15:00 AM
In the grading summary it appears that formula D was used to calculate the regular excavation. Should formula E have been used instead which would make regular excavation 8,885 CY.  
Answer   Date: 6/15/2016 3:05:08 PM
Due to lateness of this discovery, an addendum now would necessitate delay of bids. If a change is needed, it will be handled post award.  
 
Subject: Storm Drainage Type: Plan
Question Date: 6/10/2016 10:45:17 AM
Many storm locations require the installation of new storm lines and the removal of existing in the same operation/excavation. Is it expected that each line will be installed all the way across existing 220 in one night?  
Answer   Date: 6/10/2016 4:21:53 PM
It is not required that each line be installed in its entirety in a single night.  
 
Question Date: 6/10/2016 10:50:14 AM
Pipe 4-1 and 10-1 are being jacked under exiting 220. Would VDOT consider changing all crossing to jack and bore from open cut? Constructability issues exist with shoring needs, pavement patching, temporary drainage, and duration/nights need per crossing.  
Answer   Date: 6/13/2016 1:46:36 PM
VDOT will not consider changing all crossings to jack and bore from open cut.  
 
Question Date: 6/10/2016 10:46:28 AM
When patching existing 220 to open back to traffic at the end of the storm installation night operation will traffic be allowed to run on a stone patch?  
Answer   Date: 6/10/2016 4:21:25 PM
No. Restoring of the existing asphalt surface will be required.  
 
Subject: Construction Signs Type: Plan
Question Date: 6/8/2016 10:27:41 AM
Will any construction signs (i.e.Type "O") be required beyond the limits shown on plan sheets 1J(3B) - 1J(11D). If so, can you provide the quantity and locations?  
Answer   Date: 6/9/2016 8:39:15 AM
Yes, there will be wide load restriction signs required beyond the limits of plan sheets 1J(3B) – 1J(11D). Locations are described in note 16 of the TTC General Notes on sheet 1J(1). The pay item is SF of Construction Signs.  
 
Subject: Dry Riprap Cl A1 Type: Proposal
Question Date: 6/7/2016 11:23:51 AM
Please confirm the unit for bid item 720 Dry Riprap Cl A1. I believe the correct unit is TONS  
Answer   Date: 6/9/2016 10:57:52 AM
This will be corrected in an addendum to be issued tomorrow.  
 
Subject: Temporary Shoring Type: Proposal
Question Date: 6/7/2016 10:38:08 AM
Please confirm the temporary shoring is only required at Structure 5-1 and 8-1 (box culverts). Please also confirm the bid unit. I believe the more appropriate unit is either SF or LS.  
Answer   Date: 6/9/2016 3:32:24 PM
Temporary Shoring is only anticipated at Structure 5-1 and 8-1. The bid unit is confirmed at SY. The quantity unit is consistent with the schedule of items, summary, and note on sheet 1J(2). SY as the calculated anticipated quantity was confirmed by the designer.  
 
Question Date: 6/10/2016 9:57:49 AM
If temporary shoring is needed to install cross pipes to shore the existing roadway will it be paid for by the unit pricing of line item 320?  
Answer   Date: 6/10/2016 4:22:51 PM
Installation of pipes shall follow specification 302.04 Measurement and Payment, Pipe which includes sheeting and shoring as part of the pipe pay item.  
 

Displaying questions 1 - 6 (of 6)