Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
I60
95952
(NFO)0029-071-681,C501,B645
1/29/2016
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Trees
Type:
Specifications
Question
Date:
1/18/2016 8:25:47 AM
Well the trees for the temporary driveway be cut also by VDOT?
Answer
Date:
1/21/2016 5:25:03 PM
Yes, VDOT is in the process of clearing these trees.
Subject:
Temporary Road
Type:
Plan
Question
Date:
1/15/2016 10:54:33 AM
Will temporary roadway be demoed, if so are pipe and structures to be left in place? What is pay item for removal?
Answer
Date:
1/21/2016 5:24:27 PM
Sequence of Construction and Maintenance of Traffic Phase 4, sheets IH(8) and IH(9) show temporary road to be demolished. On sheet 2B is the Drainage Description which has two columns one for permanent drainage items titles Sheet 3 and one for temporary drainage items titled Sheet 3 (Temporary). The cost of the 11 temporary items (structures and pipes) includes installing and removing them since they are temporary based on VDOT Specification 105.14 page 50.
Subject:
Utilities
Type:
Proposal
Question
Date:
1/15/2016 10:48:06 AM
Have all utilities been relocated or will they need to be worked around?
Answer
Date:
1/21/2016 5:24:00 PM
Aside from the AT&T Fiber Optic Cable located within the median, all utilities will be relocated prior to Notice to Proceed. Refer to the “Special Provision for Section 105.08 – Cooperation with Regard to Utilities, Facilities Owned by AT&T” for utility coordination during construction.
Subject:
Existing Drainage
Type:
Proposal
Question
Date:
1/15/2016 10:47:06 AM
Will existing ditch and structure #3-3 between the north bound and south bound lanes be put back to original grades/contours upon completion?
Answer
Date:
1/21/2016 6:12:22 PM
Yes, but there should not be any adjustment to the top of structure 3-3 only tie-ins for a permanent pipe at 3-2 to 3-3 and a temporary pipe at 3-9 to 3-3.
Subject:
Tree Removal Restrictions
Type:
Specifications
Question
Date:
1/9/2016 12:18:09 PM
On page 287 of the Special Provisions, a tree removal time of year restriction is listed from April 15 to September 15. Is this restriction applicable for this project? There appears to be only one tree where this may apply.
Answer
Date:
1/12/2016 3:33:55 PM
Yes, the tree removal time of year restriction applies to this project. VDOT is in the process of clearing trees prior to this restriction.
Subject:
Removal of Existing Poles
Type:
Plan
Question
Date:
1/9/2016 12:14:33 PM
On a site visit, we noted that there are two communication utility poles and a ground mounted box near the bridge that appear to be abandoned. The excavation for the new abutments will undermine these poles and box. Will the poles be removed by others or should we include that in the removal price for the existing structure?
Answer
Date:
1/12/2016 3:14:53 PM
The poles will be removed by the utility company. The contractor shall coordinate with the utility owner.
Subject:
Railroad Clearances
Type:
Other
Question
Date:
1/9/2016 12:13:41 PM
Paragraph III.2.c on page 276 provides for a 6 foot horizontal clearance from the centerline of the track. Paragraph 5 on page 5 of the NSRR Agreements specifies a minimum 13 foot horizontal clearance. The dimension on sheet 1 of the structures drawing specifies a 20 foot horizontal clearance. The 20 foot clearance will result in a span distance of 54 feet for the demolition shield. Is it acceptable to use the 13 foot clearance stated in the agreement?
Answer
Date:
1/21/2016 5:29:06 PM
Yes.
Subject:
Existing Bridge Plans
Type:
Plan
Question
Date:
1/5/2016 11:58:51 AM
Will the plans for the existing bridge be made available to estimate the removal cost (bid item 0970)?
Answer
Date:
1/7/2016 10:39:09 AM
Existing bridge drawings are now available on Falcon.
Displaying questions 1 - 8 (of 8)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/20/2024 5:02:02 AM
2008