Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
I21
90092
(NFO)0011-082-713, M501, B620
9/18/2015
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Structural steel permissable field splices
Type:
Plan
Question
Date:
9/15/2015 8:17:41 AM
Can the permissible field splices be eliminated without redesign or engineering if the fabricator can get the girders delivered to the site?
Answer
Date:
9/16/2015 4:27:30 PM
Permissible bolted splices type 1 can be eliminated without redesign or engineering if the fabricator can get the girders delivered to the site.
Subject:
Flexible Pavement Planing
Type:
Proposal
Question
Date:
9/14/2015 4:26:26 PM
Are not bid items 180 and 320 the same item? Will one be deleted from the proposal?
Answer
Date:
9/16/2015 3:58:56 PM
These are duplicates. We will remove one from BidX. Due to the lateness, the correction to the price sheets will be made in the final contract.
Subject:
Goetextile Geogrid
Type:
Plan
Question
Date:
9/14/2015 11:04:30 AM
Please provide a detail and specification for the geotextile goegrid shown on plan sheet 4B
Answer
Date:
9/17/2015 1:45:21 PM
Install layers of 3XT geogrid at the bottom of the slope at the locations shown on Sheet 4B between El. 1135 and El. 1142. Geogrid length = 10 feet and the Geogrid LTDS = 1877 LB-FT.
Subject:
WEAP Analysis
Type:
Plan
Question
Date:
9/9/2015 11:40:33 AM
Will a WEAP analysis be required in addition to the PDA testing? If so, is the contractor responsible for the analysis and how will it be paid?
Answer
Date:
9/10/2015 2:41:48 PM
WEAP analysis (Wave Equation Analysis of Pile Driving) is required. The contractor is responsible for the analysis and the cost is included in the Dynamic Pile Test item.
Subject:
Soil Nail Wall
Type:
Plan
Question
Date:
9/4/2015 10:08:46 AM
Sheet 2B(1) shows a 13’ drilled length typical and a note that states " *Indicates minimum required drilled nail length from back face of shotcrete layer to tip of soil nail”. Sheet 2B shows a proposed ROW 13’ from the back face of the wall. Can the soil nails be installed deeper or are they limited to 13' because of the ROW?
Answer
Date:
9/9/2015 6:23:45 PM
The soil nail length is limited due to ROW constraints.
Subject:
Geotechnical Information
Type:
Other
Question
Date:
9/3/2015 2:59:35 PM
Please post any available soils information in the area of the soil nail walls
Answer
Date:
9/9/2015 6:13:26 PM
There is no additional information beyond what is provided in the geotech report.
Subject:
Wall Architectural Treatment
Type:
Plan
Question
Date:
9/3/2015 1:43:26 PM
Proposal line number 0290, “Wall Architectural Treatment”, is this item exclusively for the permanent soil nail wall? Does any part of the bridge structure get architectural treatment?
Answer
Date:
9/9/2015 6:24:17 PM
Only the soil nail wall gets the architectural treatment.
Subject:
Asbetos Inspection
Type:
Proposal
Question
Date:
9/3/2015 10:20:01 AM
Has the existing bridge been inspected for asbestos? If so, what were the results of that inspection?
Answer
Date:
9/9/2015 6:22:52 PM
An inspection has been done and no asbestos was detected. The inspection report will be posted on the Construction website.
Subject:
Impact Attenuators
Type:
Bid Sheet
Question
Date:
9/3/2015 10:18:36 AM
The bid item for impact attenuators shows a quantity of 16 each. Based on the MOT plans, we have only been able to locate 8 attenuators. Where would the remaining 8 each go?
Answer
Date:
9/10/2015 2:44:06 PM
There are only 8 attenuators needed on the project. An addendum will be issued correcting this.
Subject:
Message Boards
Type:
Plan
Question
Date:
9/3/2015 10:16:38 AM
On plan sheet 1K(1) under Public Communications, #3 states that the contractor shall have a minimum of 2 message board in place for use as directed by the engineer. Does "in place" mean that the contractor will have to set up two message boards on the project for the duration or just if needed? And if they are set up for the duration of the project, will they be paid for only when being used or for the duration of the project?
Answer
Date:
9/10/2015 4:05:52 PM
Message boards will be used one week prior and one week after each traffic shift. If additional hours may be required as directed by the Engineer, and will be paid at the hourly rate for the bid item. Message boards will not be required to be held in reserve for the project.
Displaying questions 1 - 10 (of 15)
Page:
1
2
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/20/2024 1:14:27 AM
2008