Subject: Existing Bridge 6004 Type: Other
Question Date: 9/17/2015 11:13:02 AM
IS it possible to get a copy of the as-builts for the existing bridge #6004?  
Answer   Date: 9/17/2015 1:30:29 PM
The Department does not have as-built plans for this.  
 
Subject: Pile Test Type: Proposal
Question Date: 9/16/2015 8:50:55 AM
The bid item sheet calls for a driving test for the 10" piles, but the proposal calls for end bearing test. Which is applicable?  
Answer   Date: 9/16/2015 3:47:35 PM
Both of these are shown on the plans and on the bid sheets.  
 
Subject: DBE Requirement Type: Proposal
Question Date: 8/20/2015 11:24:11 AM
This proposal was received without the C-111 listing the required DBE percentage. Will this be corrected with an addendum before the project is bid?  
Answer   Date: 8/20/2015 12:55:29 PM
Yes, it will be addressed by addendum.  
 
Subject: Construction Timeframe Type: Specifications
Question Date: 8/14/2015 2:27:48 PM
The specified time frame for construction is set as 5/2/2016 to 8/26/2016 and falls within the work restrictions for federally protected bats. Please confirm that demolition, driving of sheet piling, and bridge construction will not violate the requirements.  
Answer   Date: 8/18/2015 9:28:23 AM
A pre-award evaluation will be conducted by the department, then again ten (10) days before beginning the work. If the specific bat is found then VDOT and the successful contactor will mutually agree upon any necessary action.  
 