Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
H55
87865
(NFO) 0014-057-562, C501
9/18/2015
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Pavement
Type:
Other
Question
Date:
9/18/2015 1:36:45 PM
Line 350 - Pavement Replacement - for which area of pavement is this Line Item? What is the required typical section?
Answer
Date:
9/22/2015 2:27:47 PM
When Roadway or Parking lots are disturbed during Utility work and Contract or specifications does not call out replacement of Asphalt to be included in other items, then the Line item for Pavement Replacement (line 350) shall be utilized. Pavement structure for roadway or parking lot Pavement Replacement is on plan sheet 2A. When in roadway then use Full Depth Replacement when in parking lots structure depends on type of lot III or IV
Subject:
Clearing
Type:
Proposal
Question
Date:
9/18/2015 10:39:58 AM
Line Item 1000 lists CLEARING OF PARCEL NO.PARCEL NUMBERS 1, 2, 4, 8,10, 14. Line Item 40 is a Lump Sum Clearing item. Please clarify what is to be included in each of these line items
Answer
Date:
9/18/2015 3:12:05 PM
Please reference Section 301 for Line Number 0040 and Section 516 for Line Number 1000.
Subject:
Demolition
Type:
Proposal
Question
Date:
9/18/2015 10:35:05 AM
Line Item 990 lists D701,D700,D901,D902,D702 and D904. The Demolition Sheet 2D does not list D-700 or D-701. Please clarify.
Answer
Date:
9/18/2015 2:45:30 PM
D-700 and D-701 were signs located on Parcel 001. These signs are no longer in conflict and do not require demolition.
Subject:
Concrete Class A-4 Concrete Box Culvert
Type:
Bid Sheet
Question
Date:
9/16/2015 4:50:37 PM
Will a pre-cast box culverts be acceptable with the cost for concrete and rebar broken down into the specified quantities?
Answer
Date:
9/17/2015 1:39:59 PM
No. Sheet 2C(1) Note 1 states that all drainage structures items shall be precast.
Subject:
Soils Report
Type:
Other
Question
Date:
9/14/2015 7:03:12 AM
Is a soils report available for this project?
Answer
Date:
9/16/2015 11:18:52 AM
These reports will be posted on the Construction website under ANNOUNCEMENTS.
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/28/2024 4:37:43 PM
2008