Project Info
Order Number UPC State Project Number Last Date to Post Questions
H95 95951 (NFO) 0622-071-680, C501, B691 6/19/2015
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Construction Signs Type: Proposal
Question Date: 6/15/2015 10:40:12 AM
Are theVDOT provided post for the construction signs wood or metal? Is the installation and removal cost incidental to the project or will a bid item be added?  
Answer   Date: 6/15/2015 11:31:47 AM
The VDOT provided sign posts are metal. The cost for installation and removal is covered on plan sheet 1H(1), Note 26, which states, “It is the intent of the Department to minimize, as much as is practicable, the time impacts associated with procurement of Construction Signs for this project. The Construction Signs, hardware, anchors and posts will be furnished by Department for the Contractor. The Contractor will be responsible for installing, maintaining, covering and uncovering, relocating and removing temporary sign panels, sign supports, any additional hardware, anchoring material, delineators, flags and any other items incidental to completing the work. The cost thereof shall be included in the price bid for other appropriate pay items. All Construction Signs shall be returned to the Department upon completion of the project.”  
 
Subject: US Bridge Type: Specifications
Question Date: 6/11/2015 9:09:53 AM
What is the contact information for the US Bridge representative that is working on this project?  
Answer   Date: 6/11/2015 11:24:57 AM
The contact information for the US Bridge Representative is as follows: Mr. Brian Mergenthaler ~~~Regional Sales Manager for U.S. Bridge ~~~Cell Phone: (412) 445-7661 ~~~Email: bmergenthaler@usbridge.com  
 
Subject: Truss Bridge Deck Type: Plan
Question Date: 6/4/2015 11:07:06 AM
Notes on Plan Sheet 7 of 18 state the stay in place decking cannot be welded to the stringers and the deck overhangs must be formed in the field. Given the extremely tight time limit on this project and the extremely limited work area between the exterior stringer and truss, we ask if the plans and shop drawings can be amended to include full width deck pans plug welded to the stringers with full length edge dams welded to both sides of the bridge flooring.  
Answer   Date: 6/4/2015 12:13:27 PM
The truss is designed to be composite with the floor beams. Shear stud connectors will be attached to the floor beams in the shop. The truss fabricator/vendor will provide stay-in-place metal decking needed to place the concrete deck between stringers using support angles and straps. Please note that welding of stay-in-place metal decking or angle supports to stringers or floor beams will not be permitted. We would encourage Contractors to discuss forming deck overhangs, deck placements and screed set ups on truss superstructures with U.S. Bridge or other fabricators/vendors of similar systems.  
 
Subject: Truss Type: Plan
Question Date: 6/4/2015 10:48:48 AM
Please post the shop drawings for the truss bridge,  
Answer   1 previous answer(s) Date: 6/11/2015 11:26:28 AM
The approved shop drawings have been posted on the Construction website.  
 

Displaying questions 1 - 4 (of 4)