Order Number
UPC
State Project Number
Last Date to Post Questions
G95
80993
(NFO) 0001-026-107, C501
5/15/2015
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Item #0780 Cont. Req
Type:
Bid Sheet
Question
Date:
5/14/2015 12:05:34 PM
What is the intention of item number 0780 cont. req. 1 TEC.? What is TEC? Please Clarify.
Answer
Date:
5/14/2015 3:01:29 PM
This item has been removed by addendum, please upload new bidx price sheets prior to bidding.
Subject:
Working Hours
Type:
Specifications
Question
Date:
5/14/2015 10:45:15 AM
Is all the work to be done during night time hours or only work that affects traffic flow? Please clarify.
Answer
Date:
5/15/2015 7:01:25 AM
“Our intent is that all lanes that are shown on the plans will be open to traffic, except when flagging. Flagging operations are limited to 9 PM to 5AM as indicated in note #20 on sheet 1K(1).”
Subject:
Grading Summary
Type:
Plan
Question
Date:
5/13/2015 2:43:05 PM
There are two grading summaries on the plans. Which is correct?
Answer
Date:
5/14/2015 2:39:01 PM
As depicted on the Title Sheet, the project was divided into two distinct UPC numbers for funding purposes. One includes the roundabout at Route 600, and the other is for the improvements along Route 226 toward Route 1. The Grading Summaries for these are both listed on Sheet 2D(3). Please refer to the total line below the second summary it should match the quantities in the price sheets. The quantity on the price sheets takes precedence over everything else, please bid accordingly.
Subject:
Loop Detectors
Type:
Plan
Question
Date:
4/24/2015 9:28:15 AM
The plans show the loop detectors to be 6' x 50' (sheets 7(1) through 7(9)). As the typical standard is 6' x 40' can you confirm that the loops are 6' x 50'?
Answer
Date:
5/11/2015 1:53:06 PM
6’ x 50’ loops are the standard for VDOT Central Region Operations.
Subject:
Temporary traffic signals
Type:
Plan
Question
Date:
4/24/2015 7:18:25 AM
Will the Department allow the existing controller cabinets (that are to be removed) to be used for the temporary signals; items 1550 & 156?
Answer
Date:
5/11/2015 1:54:01 PM
The department will allow the existing controller cabinets being used during temporary signalization.
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/25/2024 10:50:04 PM
2008