Order Number UPC State Project Number Last Date to Post Questions
H54 101845 (NFO) 0664-114-227, M501 6/19/2015
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Anodes Type: Specifications
Question Date: 6/19/2015 4:23:39 PM
Will the VDOT project anodes need to be tied in to the City of Hampton's new Cathodic protection system ? Will conductivity need to be tested on both walls  
Answer   Date: 6/22/2015 9:16:39 AM
The VDOT sheet pile wall cathodic protection system does not need to be connected to the City of Hampton cathodic protection system in order to function properly. Testing to ensure the CP system is working properly on the VDOT sheet pile wall is required.  
 
Subject: Tie in to City of Hampton Project Type: Bid Sheet
Question Date: 6/19/2015 4:20:33 PM
There is no line item for the removal of sandbags for the tie in to the City of Hampton's sheet pile wall on the Coliseum lake retrofit project. Are all contractors aware that new wetlands will be planted adjacent to the VDOT work area and that removal of sandbags and tie in to the new City of Hampton Sheet pile wall be required in this project ?  
Answer   Date: 6/22/2015 9:15:03 AM
Contractors are responsible for coordinating construction efforts with all authorities having jurisdiction. Should the future wall proposed by the city of Hampton be constructed prior to the VDOT wall, consideration to adjusting contractor compensation will be given for any additional construction activities required.  
 
Subject: Material Cost Escalation Type: Other
Question Date: 6/19/2015 4:16:30 PM
If the City of Hampton's Coliseum lake project delays the start of this project. Will the contractor be compensated for an increase in cost of materials due to this delay. particularly the steel sheet piles.  
Answer   Date: 6/22/2015 9:14:13 AM
Work on both projects may be done simultaneously and VDOT will help with coordinating construction activities with the City of Hampton. Consideration of adjustments to contractor compensation will be given to any unavoidable delays should they occur.  
 
Subject: Construction Access Type: Other
Question Date: 6/19/2015 4:14:07 PM
The City of Hampton has a current project that will limit access to the job site( Coliseum Lake retrofit). Will this project begin after the City of Hampton project ? Will additional lane closures or additional measures of access be permitted to off set the lack of access from the City of Hampton's project.  
Answer   1 previous answer(s) Date: 6/22/2015 9:12:57 AM
The projects may begin simultaneously. Coordination with authorities having jurisdiction will be necessary to ensure timely completion of construction activities. Consideration will be given to any scheduling conflicts that may arise  
 
Question Date: 4/9/2015 7:24:01 AM
Will Contractors be permitted to use a portion of the Hampton Coliseum parking lot for a laydown area and construction access?  
Answer   Date: 4/9/2015 8:24:22 AM
As per the Construction Access general note on sheet 2, Contractors will be paid a Lump Sum for Construction Access, this includes “. . . coordination with jurisdictions having authority . . .”, thus Contractors will need to independently coordinate with the Hampton Coliseum in order to use their parking lot as a laydown area and for construction access.  
 
Subject: Types 1, 4 sheet pile cover plate steel grade Type: Specifications
Question Date: 5/15/2015 10:06:27 AM
Will ASTM A588 steel be acceptable for the cover plates? ASTM A690 steel plate is not commercially available.  
Answer   Date: 6/17/2015 2:44:45 PM
A690 steel plates are commercially available and are required for use as sheet pile cover plates designated for this project. A588 steel is not an acceptable alternative to A690 steel for this project.  
 
Subject: Sheet pile types 1 & 4 section modulus Type: Specifications
Question Date: 5/15/2015 9:59:54 AM
Cover plate detail shown on plan sheet 8 of 18 does not meet the highest section modulus requirement shown for Type 1 and Type 4 on same plan sheet. PZC26 w/1.5625" x 3.5" plate achieves 83 in3/ft. Will the cover plate detail shown be accepted or does the 89 in3/ft requirement need to be met?  
Answer   Date: 5/18/2015 7:43:57 AM
The cover plate detail will be revised to meet the 89 in^3/ft minimum section modulus requirement.  
 
Question Date: 6/19/2015 10:40:05 AM
EPLANS NOT WORKING  
Answer   Date: 6/19/2015 10:49:45 AM
We just checked and they appear to be working now, please try again.  
 
Question Date: 6/18/2015 9:17:48 AM
Will a revised plan sheet be forthcoming showing the revised cover plate detail?  
Answer   Date: 6/19/2015 9:53:15 AM
The revised plan sheet has been uploaded.  
 
Subject: 5/8/15 Rev Letter Type: Plan
Question Date: 5/11/2015 10:43:49 AM
Rev Letter states that revised plans 3, 6, 7 & 8 are available for download on the Falcon site. We do not see any revised plans. All are currently dated 3/16/15. When will the revised plans be available?  
Answer   Date: 5/11/2015 11:53:36 AM
The sheets are available on falcon now.  
 
Subject: Bid Item 0080 Dry Rip Rap Type: Bid Sheet
Question Date: 4/17/2015 8:09:15 AM
The bid item quantity for 0080: Dry Rip Rap is 12.00 ton. Our preliminary takeoff indicates a quantity in excess of 300 tons. Can you please check your quantity?  
Answer   Date: 4/20/2015 8:00:39 AM
The reciept of bids has been delayed, the quantity will be admended.  
 
Subject: Exterior Anode Installation Type: Plan
Question Date: 4/16/2015 8:52:45 AM
Is it acceptable to install the 375 lb. anode to the exterior face prior to driving?  
Answer   Date: 4/16/2015 9:10:14 AM
Yes it is.  
 
Subject: MOT Type: Plan
Question Date: 4/16/2015 8:46:27 AM
On sheet 18(A) MOT Notes, it states the lane use/restrictions for 1 lane open, 1 lane closed to be November - April. Is this correct? If so, is there any variance on the start month?  
Answer   Date: 4/16/2015 9:09:35 AM
Yes, this is correct. All work requiring a “long-term” full-lane closure cannot begin until November 1st, 2015 and must be finished by March 31st, 2016. All other work can be started before then.  
 

Displaying questions 1 - 10 (of 16)
Page: 1 2 First Previous Next Last