Subject: Joint Sawing and Sealing of Overlay Type: Proposal
Question Date: 2/18/2015 2:58:03 PM
Within the proposal, it states the overlay shall be sawed and sealed. There is no bid item for this work. Is it incidental? Is it an error all together?  
Answer   Date: 2/19/2015 8:15:37 AM
This was included in error, please disregard.  
 
Subject: Modified Flume with Rip Rap Protection Page 58 Type: Proposal
Question Date: 2/16/2015 4:14:43 PM
Does the Department have the necessary Right of Way for the contractor to gain access to the toe of these flumes? Most of these flumes will be over 50 feet in length and at almost vertical drop offs which will require extensive Clearing and Grubbing of significant tree sizes both where the flumes will be and to gain access to the bottom of these severe slopes through the heavy forest from an existing power line right of way.  
Answer   Date: 2/18/2015 3:35:54 PM
Yes, the Department has the necessary Right of Way and there is an access entrance to enter the right of way toe of slope.  We also identified the flume locations to be at areas with minimal vegetation removal  
 
Subject: Project numbers? Type: Proposal
Question Date: 2/10/2015 12:35:45 PM
Why are there 2 project numbers listed in the proposal? 1 (NFO) and 1 not?  
Answer   Date: 2/10/2015 1:05:19 PM
There are two funding sources for this project, please bid as a federal project.  
 

Displaying questions 1 - 3 (of 3)