Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
405
106151
SS4A-964-F15, P401
12/12/2014
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Patching
Type:
Proposal
Question
Date:
11/24/2014 11:53:38 AM
In the schedule notes, patching method is listed as a "milling or leveling/scratch" to be determined by the engineer. Does VDOT feel SM-12.5A is a suitable mix for leveling? What will be the criteria for choosing between milling and leveling/scratch?
Answer
Date:
12/10/2014 3:31:16 PM
Yes, the SM-12.5A is graded fine enough to allow for a 3/4 inch – 1.5 inch thickness suitable for leveling/scratch. The Residency Administrator and VDOT Project Engineer or their respective designees, shall determine the following prior to commencement of work: - asphalt patching locations - method of patching repair by milling or leveling/scratch - depth of milling and width for perimeter patch tie-ins This criteria for choosing is based on field conditions and sub-division existing thin structures.
Displaying questions 1 - 1 (of 1)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/25/2024 12:24:43 AM
2008