Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
405 106151 SS4A-964-F15, P401 12/12/2014
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Patching Type: Proposal
Question Date: 11/24/2014 11:53:38 AM
In the schedule notes, patching method is listed as a "milling or leveling/scratch" to be determined by the engineer. Does VDOT feel SM-12.5A is a suitable mix for leveling? What will be the criteria for choosing between milling and leveling/scratch?  
Answer   Date: 12/10/2014 3:31:16 PM
Yes, the SM-12.5A is graded fine enough to allow for a 3/4 inch – 1.5 inch thickness suitable for leveling/scratch. The Residency Administrator and VDOT Project Engineer or their respective designees, shall determine the following prior to commencement of work: - asphalt patching locations - method of patching repair by milling or leveling/scratch - depth of milling and width for perimeter patch tie-ins This criteria for choosing is based on field conditions and sub-division existing thin structures.  
 

Displaying questions 1 - 1 (of 1)
Page: 1 First Previous Next Last