Subject: item 2320 relocate sign Type: Proposal
Question Date: 12/11/2014 3:40:00 PM
The contract states,"Relocate Existing Ground Mounted Sign Panel will be measured in units of each and will be paid for at the contract unit price per each. This price shall include removing and relocating sign panel; furnishing and installing new mounting hardware, brackets, on a new structure." Does this mean that the Contractor is to furnish a new structure or will the sign be relocated to a new structure paid for under a separate pay item?  
Answer   Date: 12/12/2014 11:51:50 AM
The answer is yes to both questions. One payment is made to remove and relocate the panel. There is a separate payment for the sign support, which has been quantified in the contract, as well, a separate payment for the foundation.  
 
Subject: Asphalt Curb MC-3B Type: Plan
Question Date: 12/11/2014 10:19:00 AM
The job includes 475 LF of MC-3B Asphalt Curb on ramps A,C & D. This application typically gets curb backup material with it and typically has a separate pay item for it by the ton. Will VDOT require curb backup on this MC-3B? If so, will it be incidental to the MC-3B or will a pay item be added later by work order to cover this?  
Answer   Date: 12/15/2014 3:28:33 PM
The curb backup will be required on the MC-3B. Cost of the curb backup shall be incidental to the MC-3B.  
 
Subject: Undercut Type: Plan
Question Date: 12/1/2014 12:31:40 PM
There is an Undercut Material Chart on Sheet 2S(1) that mentions undercut, but it does not state which bid item where it is to be included. Please clarify.  
Answer   Date: 12/2/2014 7:33:16 AM
00118 EXCAVATION UNDERCUT MATERIAL  
 
Subject: Grding Diagram Type: Plan
Question Date: 11/24/2014 10:27:34 AM
Phase 1A - Route 666(1001+50-1005+50)-(1032+50-1037+50) total regular excavation does not seem to add up to 1050. Please clarify. Also the total for Phase 1B has more root mat(9955) in cut sections than roadway cut(9336). Please clarify.  
Answer   Date: 11/25/2014 11:28:20 AM
The quantities for the Phase 1A - Route 666(1001+50-1005+50)-(1032+50-1037+50) will be updated via addendum. Rootmat quantities in overall phases will be updated via addendum  
 
Subject: Revisions Type: Plan
Question Date: 11/19/2014 12:17:19 PM
Cannot access revised plans on Falcon. Please investigate. Says web page not available.  
Answer   Date: 11/20/2014 7:54:08 AM
The issue has been resolved, you should be able to access them now.  
 
Subject: Existing traffic components Type: Plan
Question Date: 11/14/2014 9:28:25 AM
Will the existing cabinet and other signal components for each intersection be available to be utilized on the temporary signals?  
Answer   Date: 11/18/2014 8:35:26 AM
Temporary signals are based on performance and maintaining other requirements. Use of the existing signal equipment for the temporary signal is at the contractor discretion.  
 
Subject: Bridge Deck Drainage System Type: Plan
Question Date: 11/10/2014 11:49:40 AM
On Sheet 34 of 46 of the Bridge plans, it notes that the down spouts are to be ASTM A53 Schedule 40 black seamless pipe. Would a fiberglass equivalent be an acceptable alternative?  
Answer   Date: 11/12/2014 2:03:41 PM
The note specifies steel pipe. Please bid according to the note.  
 
Subject: Grading Summary Plan Quantity Type: Plan
Question Date: 11/4/2014 10:55:01 AM
on Sheet 2S(1), Roadway Cut (column C) is a plan quantity. Typically, the Roadway Cut includes Root Mat in Cut Sections, but in several locations, the "Roadway Cut" quantity is less than the " Root Mat in Cut Sections." Is the plan quantity for "Roadway Cut" correct? If so, how with the "Root Mat in Cut Sections" be paid?  
Answer   Date: 11/6/2014 4:25:25 PM
The ‘Roadway Cut’ is correct. There are errors in ‘RootMat in Cut/Fill’ quantities. The RootMat quantities as well as affected Regular Excavation & Borrow will be updated via addendum.  
 
Subject: Grading Summary Type: Plan
Question Date: 11/4/2014 9:32:18 AM
On Plan Sheet 2S(1), the formula for determining Borrow seems to be incorrect. Can you please confirm this is accurate or provide the correct formula and correct quantities?  
Answer   Date: 11/6/2014 4:25:56 PM
The formula for determining Borrow is correct. However, it’s been noticed that there are errors in ‘RootMat in Cut/Fill’ quantities. The RootMat quantities as well as affected Regular Excavation & Borrow will be updated via addendum.  
 
Subject: Surcharge Requirements Ramp A Type: Plan
Question Date: 10/20/2014 3:11:15 PM
Sheet 2 General Note G-6 2nd paragraph references the required settlement period for the section of Ramp A between 121+75 and 122+50. The plans and cross sections do not specify how much surcharge is to be placed to accomplish the required settlement. Please clarify the surcharge requirements and how the surcharge work will be paid for.  
Answer   Date: 10/22/2014 12:18:57 PM
The only surcharge is the planned embankment.  
 