Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
G34 90180 (NFO) 0091-095-927,B620 9/19/2014
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Railroad Right of Way Type: Plan
Question Date: 9/19/2014 9:48:03 AM
The special provision shows that any work within 25 feet of the tracks with heavy equipment will require a railroad flagmen, but the width or limits of the railroad right of way are not shown. There are several references within the special provisions for the railroad concerning work within the railroad right of way. Is the width of the railroad right of way known (if it is symmetrical) or can a revised roadway plan sheet be posted showing the limits of the railroad right of way?  
Answer   Date: 9/23/2014 11:51:39 AM
Assume any work within 25' of centerline of any track will require a railroad flagman. Only the railroad can determine when a flagman is required based on the contractors means and methods of performing the work. The cost for railroad flagman is invoiced to VDOT and paid as a project expense. Limits of railroad right of can be made available upon request before work begins.  
 
Subject: Bearing Dimension Type: Plan
Question Date: 9/10/2014 11:49:33 AM
There seems to be a dimensional error in the table for the abutment bearings on sheet 13 of the plans. The "Y" dimension for the stainless steel plate seems excessive. If the dimension is correct, it will be the same as the sole plate width as determined by multiplying C+3" times two. Please issue a revised drawing or provide further clarification.  
Answer   1 previous answer(s) Date: 9/17/2014 11:55:05 AM
There is an error in dimension “Y” for the stainless steel plate on sheet 13. It should be 15”, instead of 28”. The drawing will be revised before contract award. Please bid accordingly.  
 
Subject: Proposal Type: Proposal
Question Date: 8/15/2014 11:58:19 AM
When will the proposal be available on Falcon?  
Answer   Date: 8/15/2014 2:20:07 PM
The proposal will be on Falcon no later than the end of this business day.  
 

Displaying questions 1 - 3 (of 3)
Page: 1 First Previous Next Last