Project Info
Order Number UPC State Project Number Last Date to Post Questions
G09 100655 (NFO)0058-044-S83, C501 8/22/2014
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Grading Diagram Questions Type: Plan
Question Date: 8/18/2014 3:36:22 PM
Ref Sheet 2E 1) The borrow quantity does not match the calculation given. The borrow quantity given seems to be for Traffic Control Phase 1 only, but the diagram/summary does not reflect this. 2) The job appears to be a surplus haul off, but no surplus is indicated on the grading diagram. 3) Do the cut quantities for the detours include the removal of the temporary crossovers during Stage 4? It does not appear so.  
Answer   1 previous answer(s) Date: 8/22/2014 3:29:56 PM
1) The borrow quantity does not match the calculation given. The borrow quantity given seems to be for Traffic Control Phase 1 only, but the diagram/summary does not reflect this. A.) The borrow quantities shown on grading diagram for Detour West (MOT) and Detour East (MOT) are for stage 1 only. There is no borrow for other stages. 2) The job appears to be a surplus haul off, but no surplus is indicated on the grading diagram. A.) The job is a surplus haul off. 3) Do the cut quantities for the detours include the removal of the temporary crossovers during Stage 4? It does not appear so. A.) YES. The total includes the removal of all the temporary work.  
 
Question Date: 8/20/2014 5:11:10 PM
Sheet 2F2 shows 250 cy of regular excavation that is not included in the grading diagram on sheet 2. Is the 250 cy included in the regular excavation on sheet 2E?  
Answer   Date: 8/22/2014 3:30:39 PM
NO. This quantity was separated out from the grading diagram quantities and placed under the SWM breakout items. It is represented in the estimate as a separate line item.  
 
Question Date: 8/20/2014 3:54:50 PM
Sheet 5(c) shows 151 CY of Sediment Basin Excavation. Sheet 2E note 5 says "Temporary Sediment Basin Excavation is included in SWM basin quantities", yet none is shown in the diagram. Is the 151 CY included in the overall excavation or not?  
Answer   Date: 8/22/2014 3:31:18 PM
NO. This quantity was separated out from the grading diagram quantities. It is represented in the estimate as a separate line item.  
 
Subject: Engineered Soil Type: Proposal
Question Date: 8/11/2014 9:06:45 AM
Reference Special Provision- Water Quality Grass Swale, Section III. Materials Part A. Soil Media (page 199). Could you direct me to the list of approved flter media vendors?  
Answer   Date: 8/11/2014 4:22:05 PM
There is not a list of VDOT ‘approved filter media vendors”. The requirement is that the soil media supplier/suppliers chosen by the contractor certifies that their soil media meet the proportions by volume as specified in the Special Provision.  
 
Subject: Soil Borings Type: Other
Question Date: 7/31/2014 8:34:14 AM
Where can the soil borings for this project be obtained?  
Answer   Date: 7/31/2014 10:46:24 AM
It is post under announcements.  
 
Question Date: 7/31/2014 8:33:32 AM
Where can the soil borings for this project be obtained?  
Answer   Date: 7/31/2014 10:47:45 AM
It is post under announcements.  
 

Displaying questions 1 - 3 (of 3)