Subject: Item #1640 concrete foundation Type: Bid Sheet
Question Date: 4/19/2024 2:24:14 PM
The pay item is listed as1each, ssuming this would be for the new OH Sign structure which is typically paid by the CY. Please clarify  
Answer   Date: 4/22/2024 10:19:50 AM
The concrete foundation will be measured in units of each and will be paid for at the contract unit price per each. The concrete foundations will be in accordance with Specification Section 700.  
 
Question Date: 4/23/2024 2:03:01 PM
This is not a standard foundation and without approved drawings the concrete could be anywhere from 25cy up to 100cy. Concrete items 0540, 0550 and 0580 are priced per cy why would this item be different?  
Answer   Date: 4/24/2024 8:35:37 AM
The pay item will be revised to 10.2 CY in an upcoming addendum.  
 
Subject: item #1620 Remove existing OH sign structure Type: Bid Sheet
Question Date: 4/19/2024 2:13:50 PM
This item does not appear to be in the plan sheets.  
Answer   Date: 4/19/2024 3:12:30 PM
This item is for the removal of the existing overhead structure shown on Plan Sheet 6(6) at approximately Sta. 55+27.  
 
Subject: Bid Items 1130 and 1140 Type: Bid Sheet
Question Date: 4/16/2024 4:09:29 PM
Bid item 1130 is for Eradicate Linear Pvmt Mrkg and has a quantity of 555 LF. Bid item 1140 has the same description and has a quantity of 400 LF. Please advise on which bid item is correct and remove the incorrect bid item.  
Answer   Date: 4/17/2024 2:43:19 PM
Bid Item 1130 Eradicate Linear Pavement marking is under the Signing and Pavement Marking summary and Bid Item 1140 Eradicate Linear Pavement Marking is under the Temporary Traffic Summary. Both bid items are required.  
 
Subject: Bid Item Number 1030 Impact Atten. Ser. Ty. 1, TL-3, >=40MPH Type: Bid Sheet
Question Date: 4/16/2024 4:05:38 PM
The bid item 1030, Impact Atten. Ser. Ty. 1, TL-3, >=40 MPH, has a quantity of (6) in the schedule of items but a quantity of (5) on plan sheet 2C. Please advise which is correct.  
Answer   Date: 4/17/2024 2:42:10 PM
Plan sheet 2C shows 6 total Impact Atten. Ser. Ty. 1, TL-3, >= 40 MPH. There are 5 under the Maintenance of Traffic summary and 1 under the Pavement and Incidental summary.  
 

Displaying questions 1 - 4 (of 4)