Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
353 117185 PM3E-041-F21, N501 3/19/2021
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Davis Bacon Wages Type: Proposal
Question Date: 2/8/2021 10:26:28 AM
Can “OPERATOR: PAVEMENT PLANER GROUNDSMEN” be added to the PREDETERMINED MINIMUM WAGE RATES for this project?  
Answer   1 previous answer(s) Date: 2/16/2021 11:28:44 AM
Any classification not listed in the predetermined wage rates may be submitted for review and approval via Form C51 to Lynchburg District Civil Rights.  
 
Subject: RxR Type: Proposal
Question Date: 2/8/2021 10:26:06 AM
The work on route 58 MP 17.02 to MP 19.3 has a Norfolk and Southern RxR crossing adjacent to the work. Does the state have a Right of Entry or Railroad Agreement? If so, will the contractor or department be responsible for railroad flaggers?  
Answer   Date: 2/16/2021 11:30:17 AM
The Contractor shall not perform work within 10 feet of the Railway right-of-way in accordance with SPCN SECTION 108.02—LIMITATIONS OF OPERATIONS (RAILWAY R/W) on page 8 of the proposal. A Right of Entry and Railroad agreement will not be required.  
 
Subject: 16516 Flex.Pave.Tie-In Planing 0"-2" Type: Proposal
Question Date: 2/8/2021 10:25:04 AM
In the No Plan Assembly several sections have 16516 Flex.Pave.Tie-In Planing 0”-2” (ACOT-1s) on sections that are mill and fill. Where will this item be used? Pages 235, 237, 239, 240, & 241  
Answer   Date: 2/16/2021 11:29:42 AM
This item will be used on transitions into existing bridges and terminal joints as necessary to provide a smooth transition.  
 

Displaying questions 1 - 3 (of 3)
Page: 1 First Previous Next Last