Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
D33
101238
0618-067-709, M501, B622
10/16/2020
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Drilled Shaft Rebar
Type:
Proposal
Question
Date:
10/14/2020 3:13:18 PM
There is no pay item for the drilled shaft rebar. Please add a pay item for this work.
Answer
Date:
10/16/2020 11:24:31 AM
The quantity for reinforcing steel for the drilled shafts is included in the line item number 0440 Reinforcing Steel.
Subject:
Substantial Completion
Type:
Proposal
Question
Date:
10/12/2020 5:00:03 PM
Will the substantial completion remain July 30, 2021?
Answer
Date:
10/16/2020 11:23:47 AM
Please see the most recent addendum removing the substantial completion provision from the contract.
Subject:
Existing Plans
Type:
Plan
Question
Date:
10/1/2020 9:55:50 AM
Are existing bridge plans available? If so could they be posted to Project Wise?
Answer
Date:
10/7/2020 3:54:25 PM
Existing bridge plans are not available.
Subject:
Completion Date
Type:
Proposal
Question
Date:
10/1/2020 9:35:11 AM
Cabb is showing there is a completion date of November 1, 2021. The proposal is showing a completion date of July 30, 2021. Which is correct?
Answer
Date:
Subject:
Cofferdam
Type:
Permits
Question
Date:
10/1/2020 8:20:26 AM
The Permits are showing two cofferdams. The proposals line items are showing three cofferdams. Which is correct?
Answer
Date:
10/12/2020 11:31:16 AM
The permit sketch in the bid proposal only addresses impacts to jurisdictional waters. The method of construction is anticipated to require 3 cofferdams as displayed in the plan summaries (2 impacting jurisdictional waters as shown in the permit sketch and 1 additional cofferdam that would be installed at Abut A in the pool).
Subject:
Environmental Permits
Type:
Permits
Question
Date:
9/23/2020 9:51:22 AM
Once dewatered can the pier be accessed by crossing the "pool" area as shown on the permits, or is this considered part of the live stream. Site visit revealed that water was running through this area and into the live stream.
Answer
Date:
9/24/2020 10:11:58 AM
If the pool has an open connection with the live stream, then it is part of the live stream. The Contractor can use temporary cofferdams to isolate the pool from the stream and then run across it. It does not have to be dewatered unless activities in the pool will release sediment into the stream.
Displaying questions 1 - 6 (of 6)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/25/2024 2:52:33 AM
2008