Subject: Past Bridge Modifications Type: Plan
Question Date: 10/12/2020 12:36:01 PM
The Sketches that were posted regarding the "As-built" condition of the bridge do not show what appears to be more recent modifications at/near the abutments. It appears that additional timber support elements, foundations unknown, have been installed a few feet in front of each abutment. Are these additional timber supports founded on concrete footings or pedestals ? If so are they also required to be removed as are the concrete foundations in the water ? These newer elements are not shown on the 1972 sketches but appear to be similar to the details shown in the typical framing for the pier but do now depict any foundation element.  
Answer   Date: 10/14/2020 4:22:43 PM
The temporary bents later installed in front of the abutments are located on the slope comprising wooden columns on concrete footers. The wooden sill, columns and caps of the temporary bents will be removed as part of the existing bridge. The existing footers of the temporary bents need not be removed and can remain buried when the stream slopes are restored.  
 
Subject: Cofferdams Type: Bid Sheet
Question Date: 10/12/2020 10:28:45 AM
How are the cofferdams mentioned as needed in the note on plan sheet 2 of 23 and in the permit to be paid?  
Answer   Date: 10/14/2020 4:20:40 PM
The price for cofferdams is included in the lump sum bid item for "Dismantle and Remove Existing Structure Number 6028" noted on sheet 2 of 23. Also refer to bid proposal section 413.03 for Measurement and Payment  
 
Subject: Bid Items Type: Bid Sheet
Question Date: 10/1/2020 1:46:30 PM
Considering the Clearing and grubbing needed for the project and the TOY restrictions etc... please confirm how the clearing for the project is to be paid as there is no bid item for the clearing and grubbing.  
Answer   Date: 10/2/2020 11:27:53 AM
The clearing and grubbing is inclusive of the grading LS item. (2020 R&B Section 303.06)  
 
Subject: Field Office Type 1 Type: Proposal
Question Date: 9/30/2020 10:08:46 AM
Why does the Department have the large Type 1 office in this project? This job is 9 months in duration. Shouldn't a Type 3 (200 sf) office be sufficient?  
Answer   Date: 10/2/2020 10:14:58 AM
The Trailer shall be Type I as noted in the proposal.  
 
Subject: Hazardous Material Type: Proposal
Question Date: 9/29/2020 2:33:23 PM
Can the Hazardous Material Report be posted to Project Wise?  
Answer   1 previous answer(s) Date: 10/2/2020 12:16:33 PM
Hazmat report is available in ProjectWise.  
 
Subject: Existing Bridge Plans Type: Plan
Question Date: 9/21/2020 7:45:57 AM
Are existing bridge plans available? If so could they be posted to Project Wise.  
Answer   Date: 9/21/2020 1:43:09 PM
There are no as-built bridge plans for this structure. A dimensional sketch dated November 27, 1972 and showing some detail will be provided on ProjectWise. Although this sketch conforms to the overall layout and construction of the bridge, it may not reflect more recent maintenance.  
 