U94
116959
9999-964-641, N501
8/21/2020
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Contract Term
Type:
Proposal
Question
Date:
8/8/2020 7:39:37 AM
What is the original term length of the contract? What are the term lengths of the renewals? What are the potential number of renewals?
Answer
Date:
8/10/2020 8:56:03 AM
Please see the contract documents, including the C-7 for the original term limits as well as the RENEWABLE ON CALL CONTRACTS GENERAL PROVISIONS located on page 9 of the proposal.
Subject:
Minor Structure Excavation
Type:
Proposal
Question
Date:
7/29/2020 4:34:31 PM
Will Minor Structure Excavation be paid for all pipes that are Method B Open Trench?
Answer
Date:
7/30/2020 11:06:36 AM
Minor Structure Excavation will be paid for in accordance with the 2020 R&B Specifications, specifically Section 303.06 (4).
Subject:
Method B Open Cut
Type:
Proposal
Question
Date:
7/29/2020 4:02:46 PM
In the General Notes, on Page 85, No. 11 states that "Method B pipe replacements shall be RCP CLIII or better". What criteria must be better? Is it referring to strength?
Answer
Date:
8/12/2020 10:14:11 AM
The note refers to the strength of the pipe. RCP CLIII or greater class will be acceptable.
Subject:
Fold and Form Option
Type:
Specifications
Question
Date:
7/22/2020 7:52:11 AM
On the schedule of items, lines 0220 – 0250 it calls for Method B, Category A. Are we able to use Method B, Category B – the fold and form for these items? .
Answer
Date:
7/24/2020 2:17:43 PM
Bids must be according to the current methods presented in the contract. Alternate method(s) may be submitted for the Department's review after award. If approved by the Engineer, the contract will be amended through the change order process to allow for alternate method(s).
Displaying questions 1 - 4 (of 4)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/20/2024 1:24:39 AM
2008