Subject: Temporary Shoring Type: Plan
Question Date: 7/14/2020 5:20:05 PM
Sheet 9 of the plan set details minimum shoring requirements and 24" diameter rock sockets, per the special provision the temporary shoring requires design by a P.E. If the design requires a something other than shown, i.e. different sized rock socket, will this be acceptable to the department?  
Answer   Date:
 
 
Subject: Asphalt Placement Type: Specifications
Question Date: 7/14/2020 2:50:33 PM
Given the typically cold conditions in March will the department consider extending the fix end date to allow paving within the weather limitations in the specifications?  
Answer   Date:
 
 
Subject: Environmental Permis Type: Permits
Question Date: 7/6/2020 8:37:51 AM
There are no permit sketches located in the proposal, Has VDOT obtained the necessary permits for this project, or will the contractor need to allow time to coordinate the permit submittal?  
Answer   Date: 7/10/2020 8:19:36 AM
The permits have been obtained by VDOT and are located on pages 145-147 of the proposal. Permit sketches were not required for this project.  
 