Subject: Traffic Type: Plan
Question Date: 7/17/2020 10:26:55 AM
Can the lane that is being closed on RT.58 remain closed 24/7 until the work on the sequence in complete?  
Answer   Date: 7/20/2020 3:05:41 PM
The lane closures may remain in place until work on the sequence is complete.  
 
Subject: SL-1 Type: Plan
Question Date: 7/15/2020 10:22:38 AM
In the plans on Sheet 2F on structure number 4-21 and 5-02 you ask for a SL-1 safety slab to be installed , the standards say that safety slabs are only needed if the structure is 12 foot or greater . Both structures are less 10 feet tall . Do you still want a safety slabs installed?  
Answer   Date: 7/17/2020 4:06:47 PM
SL-1 is not necessary since height is less than 12'. Plan sheet will be corrected post award.  
 