Subject: Planholders List Type: Other
Question Date: 6/17/2020 1:15:37 PM
Can someone check the emails for the latest planholders? Some of them are not in the correct place, they seemed to have copied down to the next line.  
Answer   Date: 6/17/2020 3:57:33 PM
This has been fixed.  
 
Subject: boring Type: Plan
Question Date: 6/16/2020 2:17:36 PM
are there any sub surface boring details available for this project?  
Answer   Date: 6/17/2020 11:06:44 AM
The geotech report has been uploaded to ProjectWise.  
 
Subject: Temporary Road Bed Type: Plan
Question Date: 6/15/2020 1:34:49 PM
What will the temporary road bed be constructed out of after pavement demolition but before the addition of No. 21B?  
Answer   Date: 6/16/2020 1:12:36 PM
Existing surface, aggregate base, and subbase material which will be demolished or obliterated during construction and is suitable for maintenance of traffic shall be salvaged and utilized at no additional cost to the Department. There is also prime and cover material included as bid items to be applied when subject to traffic for longer periods of time.  
 
Subject: Road Detour Type: Plan
Question Date: 6/15/2020 1:32:45 PM
Will traffic be detoured for the entirety of the project?  
Answer   Date: 6/16/2020 1:13:04 PM
No, please see Interim Milestone Completion Incentive/Disincentive special provision copied note in the proposal for details. The detour will be for a period up to 14 calendar days to install structure 4-2.  
 