Project Info
Order Number State Project Number Last Date to Post Questions
H69 0784-023-226,C501 10/23/2015
Question
Question Date: 10/14/2015
There appears to be a discrepancy between the data provided on the revised drainage description sheets and the Bid Quantities. When the data from the drainage description sheets is used in conjunction with the applied quantities from the latest VDOT Standards, they do not result in the revised bid quantities in the Advertisement, for both the Base and Additive Options.
Answer History
Previous Answers PostDate
Due to the nature of how this project is being bid, certain minor items in the base or additive may be decreased or deleted depending on which option is selected, VDOT believes the quantities are correct based on both designs based on a spot check however the contractor needs to bid the project on the information available. 10/16/2015
Due to the nature of how this project is being bid, certain minor items in the base or additive may be decreased or deleted depending on which option is selected, VDOT believes the quantities are correct based on both designs based on a spot check however the contractor needs to bid the project on the information available. 10/16/2015
Due to the nature of how this project is being bid, certain minor items in the base or additive may be decreased or deleted depending on which option is selected, VDOT believes the quantities are correct based on both designs based on a spot check however the contractor needs to bid the project on the information available. 10/16/2015