Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number State Project Number Last Date to Post Questions
D74 (NFO)0603-060-732,C501,D601 4/18/2014
Question
Question Date: 3/20/2014
Are the offsets of the core borings designated with B based off of the centerline of the existing roadway or the proposed roadway? What are the offsets of the borings designated with RW based upon? The elevations of the RW borings do not correspond with the elevations in the cross sections.
Answer History
Previous Answers PostDate
It will be added to the geo-tech report in Falcon by tomorrow. 3/28/2014
The construction baseline was revised after these borings were taken and the location data (Station, Offset, Cross Section Elevations) is no longer valid. Updated data locating the borings off of the current construction baseline will be provided as an addendum. 3/24/2014